C 4 E18 5 All work at heights tasks will to have an approved SWMS in WH&S Act D4 Site Manager or
☒ Work at
Heights
Persons falling
place and complete an employer or Hutchinson Builders 2011 Part 2
H14 Foreman /
WH&S Reg
Objects falling “Work at Heights Permit”. Permit must be completed for
2011 Part 6 Subcontractor
work from;
Failure of VIC OHS Act
EWP – Scissor or Boom 2004
Equipment
Scaffold or Mobile Scaffold VIC OHS Reg
Failure of Roof Step Ladder or Platform Ladder over 2 metres 2007
Materials 5 Where the work at height is specifically related to another Managing
the Risk of Site Manager or
high risk task i.e. scaffolding or formwork, that section of the Falls at the Foreman /
Project Risk Assessment should be reviewed prior to Workplace Subcontractor
commencing work. COP 2011
QLD, NSW &
4 Work at heights < 2 meters where necessary could consider SA Site Manager or
the use of edge protection, which includes handrails and NSW Safe Foreman /
midrails. Work on Subcontractor
Roofs
Work at heights >2 meters will require a minimum of one of Commercial Site Manager or
the following control measures must be implemented (in and Foreman /
Industrial
order of preference): Subcontractor
Buildings
4 the erection of physical barriers (such as guardrails, COP
scaffolding, EMP); Vic
3 providing a personal fall protection system (fall- prevention
of falls in
arrest harness system or travel restraint system); general
6 providing a catch system (catch net below a fall construction
perimeter) - Compliance
erection of an exclusion zone (flag bunting Code
4 minimum 2 meters back from the edge) or AS/NZS
4 1891.4:2009
work off a ladder for light work Industrial
4 Where edge protection is selected as the work at heights fall-arrest Site Manager /
control measures it must include top and mid rail, toe board, systems and
Subcontractor
devices -
mesh screen to prevent falling objects. These shall comply Selection,
with use and
Top Rail – 900mm-1100 mm from ground maintenance
Preventing
Mid Rail falls in
Toe Board – 150mm and sitting on ground housing
Mesh 25mm x 25mm mesh screening construction
2014 NSW
5 The use, installation and maintenance of the work at heights Site Manager or
Prevention
system selected will be in accordance with the relevant of falls at Foreman /
legislation, codes of practice and Australian Standards. workplaces Subcontractor
2004 WA
4 Where the pitch of the roof is over 26º and a guard railing Managing Site Manager or
system is used, the guard railing will have a top rail, mid-rail, the risk of Foreman /
toe board and an infill panel. falls at the Subcontractor
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.