Whsmp · OPW16/0021

of 586

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 153, section 1. The text section number identifies this passage in the reader.

                                  C   4    E18    5   All work at heights tasks will to have an approved SWMS in             WH&S Act       D4    Site Manager or
☒   Work at
    Heights
               Persons falling
                                                      place and complete an employer or Hutchinson Builders                   2011 Part 2
                                                                                                                                             H14   Foreman /
                                                                                                                             WH&S Reg
               Objects falling                       “Work at Heights Permit”. Permit must be completed for
                                                                                                                              2011 Part 6          Subcontractor
                                                      work from;                                                          
               Failure of                                                                                                    VIC OHS Act
                                                            EWP – Scissor or Boom                                            2004
                Equipment
                                                            Scaffold or Mobile Scaffold                                     VIC OHS Reg
               Failure of Roof                             Step Ladder or Platform Ladder over 2 metres                     2007
                Materials                         5   Where the work at height is specifically related to another            Managing
                                                                                                                              the Risk of          Site Manager or
                                                      high risk task i.e. scaffolding or formwork, that section of the        Falls at the         Foreman /
                                                      Project Risk Assessment should be reviewed prior to                     Workplace            Subcontractor
                                                      commencing work.                                                        COP 2011
                                                                                                                              QLD, NSW &
                                                  4   Work at heights < 2 meters where necessary could consider               SA                   Site Manager or
                                                      the use of edge protection, which includes handrails and               NSW Safe             Foreman /
                                                      midrails.                                                               Work on              Subcontractor
                                                                                                                              Roofs
                                                      Work at heights >2 meters will require a minimum of one of              Commercial           Site Manager or
                                                      the following control measures must be implemented (in                  and                  Foreman /
                                                                                                                              Industrial
                                                      order of preference):                                                                        Subcontractor
                                                                                                                              Buildings
                                                 4          the erection of physical barriers (such as guardrails,           COP
                                                               scaffolding, EMP);                                            Vic
                                                 3          providing a personal fall protection system (fall-               prevention
                                                                                                                              of falls in
                                                               arrest harness system or travel restraint system);             general
                                                 6          providing a catch system (catch net below a fall                 construction
                                                               perimeter)                                                     - Compliance
                                                            erection of an exclusion zone (flag bunting                      Code
                                                  4            minimum 2 meters back from the edge) or                       AS/NZS
                                                  4                                                                           1891.4:2009
                                                            work off a ladder for light work                                 Industrial
                                                  4   Where edge protection is selected as the work at heights                fall-arrest          Site Manager /
                                                      control measures it must include top and mid rail, toe board,           systems and
                                                                                                                                                   Subcontractor
                                                                                                                              devices -
                                                      mesh screen to prevent falling objects. These shall comply              Selection,
                                                      with                                                                    use and
                                                            Top Rail – 900mm-1100 mm from ground                             maintenance
                                                                                                                             Preventing
                                                            Mid Rail                                                         falls in
                                                            Toe Board – 150mm and sitting on ground                          housing
                                                            Mesh 25mm x 25mm mesh screening                                  construction
                                                                                                                              2014 NSW
                                                  5   The use, installation and maintenance of the work at heights                                 Site Manager or
                                                                                                                             Prevention
                                                      system selected will be in accordance with the relevant                 of falls at          Foreman /
                                                      legislation, codes of practice and Australian Standards.                workplaces           Subcontractor
                                                                                                                              2004 WA
                                                  4   Where the pitch of the roof is over 26º and a guard railing             Managing            Site Manager or
                                                      system is used, the guard railing will have a top rail, mid-rail,       the risk of          Foreman /
                                                      toe board and an infill panel.                                          falls at the         Subcontractor
                                          WHS Management Plan – Appendix 1 – Project Risk Assessment
                                                                                                                                                                     Page 69

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.