Original PDF page 154, section 1. The text section number identifies this passage in the reader.
4 Where the pitch of the roof is over 35º a platform will be workplace
2012 TAS &
Site Manager or
constructed to minimise the likelihood of a person falling onto Foreman /
NT
the top rail or over the guard railing system. The platform will Preventing Subcontractor
be at least 450mm wide with guardrails on the outside falls in
perimeter and an infill panel on the outside perimeter and will housing
not be used to stack materials or equipment. construction
2012 TAS &
Where the pitch of the roof is over 45º additional safeguards NT Site Manager or
will be provided as determined by a risk assessment: Foreman /
2 Use of elevating work platforms Subcontractor
4 Higher guardrails
4 Perimeter scaffolding
4 Mesh Infill Panels
4 Wider platforms
6 Fall arrest systems
6 Personal fall protection systems or catch systems used on site Competent person
will be in accordance with AS 1891.4, and must be employed
wherever work is conducted near an unprotected edge.
5 Where fall arrest systems are used the relevant SWMS will Site Manager or
include details; foreman /
Work at Heights training Subcontractor
Type of anchorage point to be used Competent person
Inspection of anchorage points
Inspection of equipment
Rescue Plan
5 Lanyards, anchorage lines or restraint lines shall be able to be Site Manager or
attached to anchorages before the operator moves into foreman /
position where there would be a risk of a fall, unless the Subcontractor
operator is already protected by another fall-arrest system. Competent person
5 Site Manager or
The type of fall-arrest system attached to an anchorage point
foreman /
shall be compatible with the anchorage strength indicated on
Subcontractor
any sign associated with the anchorage point.
Competent person
5 The following types of anchorage points are to be installed or Site Manager or
verified for a fall arrest system; foreman /
Engineer; Subcontractor
riggers pole attached to steel beam – installed by
licensed rigger
anchor bracket attached to steel structure – installed
by person that has completed a Work Safely at
Heights competency course
Manufacturers Installation Details by competent person
Proprietary Anchorage Eye into concrete
WHS Management Plan – Appendix 1 – Project Risk Assessment
Page 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.