24647 - 71 SEAVIEW TCE SUNSHINE BEACH WHS Management Plan – Appendix 1 – Project Risk Assessment
Piling - Falls (when inspecting A 5 E25 5 All tasks involving the use of plant or - WH&S Act E5 Site Manager
☒ rig, falling into pile 2011 Part 2
equipment to have an approved SWMS in H15 HSE Advisor
holes or excavations)
place which addresses at least the following - WH&S Reg Subcontractor
- Being struck by 2011 Chapter
powered mobile plant,
hazards (as applicable): 5,6
including working in - manual handling - VIC OHS Act
close proximity to piling - exposed moving parts 2004 Part 3
rigs
- excessive noise - VIC OHS Reg
- Contact with overhead 2007 Part 3.5
- vibration
or underground services
- unstable plant - Managing the
- Entanglement in piling Risk of Plant
rig moving parts - inadequate lighting
in the
- Crushing when moving - slips and trips Workplace
materials - falling objects 2013 QLD
- Collapse of partially - emissions - Managing the
assembles piling rig risks of plant
5 Site Manager
- Falling loads Ensure the correct piling rig has been selected in the
workplace HSE Advisor
- Debris falling from for the work 2014 NSW Subcontractor
heights
- Plant 1995
- Plant overturning 5 Set up area has been designed and approved Site Manager
VIC
- Hydraulic oil / diesel by Geotechnical Engineer. To ensure the - Safe guarding HSE Advisor
spill ground is suitable for set up and machine will Subcontractor
of machinery
not become unstable or collapse. Working and plant
platform to be inspected after large rain 2009 WA
events. - Managing the
risks of plant
5 Subcontractors will provide adequate in the Site Manager
supervision to ensure plant and equipment is workplace HSE Advisor
2012 SA &
used in accordance with manufacturer's Subcontractor
TAS
instructions.
- A guide to
5 Subcontractors will provide adequate managing Site Manager
safety Piling
supervision to ensure plant and equipment is HSE Advisor
work and
used in accordance with manufacturer's foundation
Subcontractor
instructions engineering
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.