24647 - 71 SEAVIEW TCE SUNSHINE BEACH WHS Management Plan – Appendix 1 – Project Risk Assessment


       Piling      - Falls (when inspecting      A   5   E25   5   All tasks involving the use of plant or - WH&S Act                    E5    Site Manager
  ☒                  rig, falling into pile                                                                       2011 Part 2
                                                                   equipment to have an approved SWMS in                                 H15   HSE Advisor
                     holes or excavations)
                                                                   place which addresses at least the following - WH&S Reg                     Subcontractor
                   - Being struck by                                                                              2011 Chapter
                     powered mobile plant,
                                                                   hazards (as applicable):                       5,6
                     including working in                          - manual handling                                 - VIC OHS Act
                     close proximity to piling                     - exposed moving parts                              2004 Part 3
                     rigs
                                                                   - excessive noise                                 - VIC OHS Reg
                   - Contact with overhead                                                                             2007 Part 3.5
                                                                   - vibration
                     or underground services
                                                                   - unstable plant                                  - Managing the
                   - Entanglement in piling                                                                            Risk of Plant
                     rig moving parts                              - inadequate lighting
                                                                                                                       in the
                   - Crushing when moving                          - slips and trips                                   Workplace
                     materials                                     - falling objects                                   2013 QLD
                   - Collapse of partially                         - emissions                                       - Managing the
                     assembles piling rig                                                                              risks of plant
                                                               5                                                                               Site Manager
                   - Falling loads                                 Ensure the correct piling rig has been selected     in the
                                                                                                                       workplace               HSE Advisor
                   - Debris falling from                           for the work                                        2014 NSW                Subcontractor
                     heights
                                                                                                                     - Plant 1995
                   - Plant overturning                         5   Set up area has been designed and approved                                  Site Manager
                                                                                                                       VIC
                   - Hydraulic oil / diesel                        by Geotechnical Engineer. To ensure the - Safe guarding                     HSE Advisor
                     spill                                         ground is suitable for set up and machine will                              Subcontractor
                                                                                                                    of machinery
                                                                   not become unstable or collapse. Working         and plant
                                                                   platform to be inspected after large rain        2009 WA
                                                                   events.                                        - Managing the
                                                                                                                        risks of plant
                                                               5   Subcontractors will provide adequate                 in the                 Site Manager
                                                                   supervision to ensure plant and equipment is         workplace              HSE Advisor
                                                                                                                        2012 SA &
                                                                   used in accordance with manufacturer's                                      Subcontractor
                                                                                                                        TAS
                                                                   instructions.
                                                                                                                     - A guide to
                                                               5   Subcontractors will provide adequate                managing                Site Manager
                                                                                                                       safety Piling
                                                                   supervision to ensure plant and equipment is                                HSE Advisor
                                                                                                                       work and
                                                                   used in accordance with manufacturer's              foundation
                                                                                                                                               Subcontractor
                                                                   instructions                                        engineering

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.