                                                                                    Hutchinson Builders – ABN:52 009 778 330

                                      WHSMP:01 – Work Health & Safety Management Plan
                                                                                                                  Version: 9.2




☒         Signage will be displayed at all entrances to the site and at various points on the temporary
          fence that describe;

                 HB as the construction company,
                 The site as a construction site, accessible to workers and authorised personnel only,
                 HB Safety Sign – hard hats, foot wear etc.,
                 Other safety signs as deemed necessary
☒         Develop a Traffic management plan to control heavy and light construction activities for the
          front property boundary.

A designated drop-off and construction “works” zone will be established. This zone will enable delivery
vehicles and plant such as concrete pumps, delivery vehicles to safely park and enter/exit the project. Traffic
controllers will be used in this area where required to warn members of the public/ other contractors on site,
of the moving equipment and to safely direct the vehicles and plant. HB will reschedule any plant and material
movements outside busy access periods.

         3.3   Site Plan
A site plan shall be prepared on the site specific induction board, identifying the following safety information:
    a. Access & egress ,
    b. Emergency Evacuation points.
    c. Amenities (Toilets, lunchroom, drinking water, temporary power etc.).
    d. First Aid Kit location.
    e. Over-head and underground hazards (power lines, sewerage / stormwater services, water and gas
       mains).
    f.     Firefighting equipment locations.
    g. Telephone numbers and location for emergencies.
    h. Bin and waste disposal methods and locations.
    i.     Crane location and lifting zone areas.
    j.     Man and materials hoist location.
    k. Site management personnel (foreman, first aid officer, safety advisor).
    l.     Adjoining public areas that could be affected by construction activities (if any).
    m. Traffic and equipment movement area plan may be a separate than the site hazard plan identifying
       items a to l (above) – refer Project Risk Assessment titled “Plant and Equipment.”
                 Delivery and storage for materials
                 Unloading and loading areas – may be the same as storage area
                 Interaction signage between plant and persons where plant need to travel around site
                 Subcontractor container storage areas
                 Plant storage areas – where required
                 Mobile crane and concrete pump set up areas




                                                                                                                Page 20 of 58

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.