Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
☒ Signage will be displayed at all entrances to the site and at various points on the temporary
fence that describe;
HB as the construction company,
The site as a construction site, accessible to workers and authorised personnel only,
HB Safety Sign – hard hats, foot wear etc.,
Other safety signs as deemed necessary
☒ Develop a Traffic management plan to control heavy and light construction activities for the
front property boundary.
A designated drop-off and construction “works” zone will be established. This zone will enable delivery
vehicles and plant such as concrete pumps, delivery vehicles to safely park and enter/exit the project. Traffic
controllers will be used in this area where required to warn members of the public/ other contractors on site,
of the moving equipment and to safely direct the vehicles and plant. HB will reschedule any plant and material
movements outside busy access periods.
3.3 Site Plan
A site plan shall be prepared on the site specific induction board, identifying the following safety information:
a. Access & egress ,
b. Emergency Evacuation points.
c. Amenities (Toilets, lunchroom, drinking water, temporary power etc.).
d. First Aid Kit location.
e. Over-head and underground hazards (power lines, sewerage / stormwater services, water and gas
mains).
f. Firefighting equipment locations.
g. Telephone numbers and location for emergencies.
h. Bin and waste disposal methods and locations.
i. Crane location and lifting zone areas.
j. Man and materials hoist location.
k. Site management personnel (foreman, first aid officer, safety advisor).
l. Adjoining public areas that could be affected by construction activities (if any).
m. Traffic and equipment movement area plan may be a separate than the site hazard plan identifying
items a to l (above) – refer Project Risk Assessment titled “Plant and Equipment.”
Delivery and storage for materials
Unloading and loading areas – may be the same as storage area
Interaction signage between plant and persons where plant need to travel around site
Subcontractor container storage areas
Plant storage areas – where required
Mobile crane and concrete pump set up areas
Page 20 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.