Hutchinson Builders – ABN:52 009 778 330
WHSMP:01 – Work Health & Safety Management Plan
Version: 9.2
3.4 HB Provided Plant
In relation to this project, the following items of plant shall be provided by HB for general use by employees
and subcontractors on site:
☒ All temporary fences erected on the proposed line of the construction site are to be maintained on a
daily basis by site team members – refer to [Public Protection Controls within Section 4 for additional
details].
☒ Signage:
Signs will be fixed at entrances to the site, on perimeter hoardings in a number of easy to see
locations.
Signs fixed to fence – ensure stability of the fence panel
Signs will include, but not be limited to, the following:
“Construction Site – Do Not Enter Authorized Personnel Only” signs,
Mandatory Safety Helmet and Safety Footwear Signs,
“HB” Construction Site General Signs, and
Directional and descriptive signs indicating the location of the site office, toilets, first aid
provisions, traffic management etc. as required.
☒ Construction workplace amenities to be provided in accordance with PP:04 – Construction
Amenities for the :
Site office’s, meeting and checked by the site team members during all on-site inspections.
☒ Generator
Generators will be tested by a licenced electrician on a 3 monthly basis.
Generators to be run through an earth leakage.
Generators powering Hoist and crane are to be used exclusively for the specified plant.
☐ Compressor
Safety clips are to be affixed and maintained for hose connections
Equipment to be maintained and serviced as per manufacturer’s specifications.
☐ Hoist
Hoists will be maintained and serviced in accordance with the maintenance & service schedule.
Licenced Hoist Operators will be responsible for the operation of the Hoist at all times the
hoist is operational.
☒ Crane (Tower or mobile)
Crane equipment will be erected in accordance with the engineer approved Site Lift Plan;
Safe work zones will be created and maintained for the duration of the time the crane is on
site, with specified exclusion zones;
Licenced Crane Operators and Dogmen will be responsible for the operation of the crane and
hooking of all loads at all times; and
Page 21 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.