SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
Responsible
H Controls / Work Methods Residual Risk
Person/s for
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
The semi-trailer is not to be moved after the restraint
1 system is released.
C 4 E 5 Traffic control and protective measures are to be Hutchinson D 4 H
Collision with other traffic
18 employed as per the requirements of the Traffic Builders Site 14
and pedestrians
Management Plan for the site. Foreman
During unloading, only persons involved with the
5 Traffic
unloading are to be in the area around the vehicle, and
Controllers
others are to be excluded via establishing a suitable
exclusion zone.
3 Footpath closures to be implemented where panels are
lifted over or placed adjacent to footpaths
C 5 E 5 Panels are not to be lifted over the top of persons. Hutchinson E 5 H
Lifting panels and panel Falling loads
erection for both tilt-up and
22 An exclusion zone (erection of suitable barriers, and Builders Site 15
signs) is to be established to protect unauthorised Foreman
pre-cast panels
3 persons entering the panel erection area and
maintained until the braces have been secured and the Licenced
lifting slings removed. Dogger
Buildings that are in the lifting path of the panel should
be evacuated at the time of the panel lifting (in the case Licenced
of a panel falling) or the work planned to be out of hours Rigger
3 when no person is located in the building.
The crane selected to perform the lifting of the pre cast
or tilt up panels is to be suitable in terms of the safe
lifting capacity of the crane and the SWL of the crane is
not to be exceeded.
4-
The panel mass is to be marked on the panel.
5
The slinging of loads, manoeuvring and placement of
panels is to be performed by a rigger and a dogman used
for guidance while the panel is being lifted.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 23
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.