                                                                                SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
                                                                                                                                                            Responsible
                                                                                      H                      Controls / Work Methods                                        Residual Risk
                                                                                                                                                            Person/s for
          Job Steps                    Potential Hazards               L    C    R    O              1. Eliminate 2. Substitute 3. Isolate 4. Engineer       Monitor &       L    C     R
                                                                                      C                               5. Admin 6. PPE                         Review
                                                                                             The semi-trailer is not to be moved after the restraint
                                                                                       1      system is released.
                                                                       C    4     E    5     Traffic control and protective measures are to be            Hutchinson       D     4    H
                                  Collision with other traffic
                                                                                 18           employed as per the requirements of the Traffic              Builders Site               14
                                  and pedestrians
                                                                                              Management Plan for the site.                                Foreman
                                                                                             During unloading, only persons involved with the
                                                                                       5                                                                   Traffic
                                                                                              unloading are to be in the area around the vehicle, and
                                                                                                                                                           Controllers
                                                                                              others are to be excluded via establishing a suitable
                                                                                              exclusion zone.
                                                                                       3     Footpath closures to be implemented where panels are
                                                                                              lifted over or placed adjacent to footpaths
                                                                       C    5     E    5     Panels are not to be lifted over the top of persons.         Hutchinson        E    5    H
Lifting panels and panel          Falling loads
erection for both tilt-up and
                                                                                 22          An exclusion zone (erection of suitable barriers, and        Builders Site               15
                                                                                              signs) is to be established to protect unauthorised          Foreman
pre-cast panels
                                                                                       3      persons entering the panel erection area and
                                                                                              maintained until the braces have been secured and the        Licenced
                                                                                              lifting slings removed.                                      Dogger
                                                                                             Buildings that are in the lifting path of the panel should
                                                                                              be evacuated at the time of the panel lifting (in the case   Licenced
                                                                                              of a panel falling) or the work planned to be out of hours   Rigger
                                                                                       3      when no person is located in the building.
                                                                                             The crane selected to perform the lifting of the pre cast
                                                                                              or tilt up panels is to be suitable in terms of the safe
                                                                                              lifting capacity of the crane and the SWL of the crane is
                                                                                              not to be exceeded.
                                                                                      4-
                                                                                             The panel mass is to be marked on the panel.
                                                                                      5
                                                                                             The slinging of loads, manoeuvring and placement of
                                                                                              panels is to be performed by a rigger and a dogman used
                                                                                              for guidance while the panel is being lifted.

584 Milton Road TOOWONG QLD 4066                                 SWMS Developed by:   Jamie Gilbert                                                             VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                              Position:            National Health & Safety Co-ordinator                                                        Page 23
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.