SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
Responsible
H Controls / Work Methods Residual Risk
Person/s for
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
5 A lift plan is to be prepared prior to lifting and cover the
5 following items:
- Crane set-up position;
- Locations of where panels are to be lifted from and
to including the operating radius of the crane;
5 - Areas on site where obstacles such as walls or
braces may be in the travel or slew path; and
- Areas where the crane cannot set up (trenches
etc.).
C 5 E 5 Panels are only to be lifted when the concrete has cured Hutchinson E 5 H
Failure of lifting insert
22 long enough for the panel to be safely lifted and the 2.5 Builders Site 15
factor of safety can be maintained on the lifting inserts. Foreman
The minimum concrete strength at which tilt-up panels
can be lifted (for most proprietary brand lifting inserts) Design
5 is 25MPa. This minimum concrete strength may be Engineer
higher for some inserts and are to be checked prior to
lifting the panels.
Obtain written documentation from the panel
manufacturer that verifies that the concrete has
5 reached the minimum acceptable strength before lifting
the panel. Lifting clutched will be 7 tonne WLL.
Ensure that the lifting equipment & components are in
current serviceable condition, test and tagged. Ensure
5 all proof of tension (i.e. certificates) is maintained on
site. Also ensure all equipment is recorded on the
register.
C 4 E 5 Overhead obstacles are to be identified prior to lifting Hutchinson D 4 H
Crane contact with overhead
18 process. Builders Site 14
structures / services
1 No part of the crane or person / equipment is to enter a Foreman
power line exclusion zone.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 24
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.