SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
Responsible
H Controls / Work Methods Residual Risk
Person/s for
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
- The anchor bolt and washer combination are to have
adequate bearing capacity – washer to be 40mm Dia;
- If designed with adjustable feet are to have the stops on
the threads to prevent over extension.
- A minimum of 2 braces secured to each panel unless
otherwise specified by an engineer.
- Locking pins with retaining devices are to be used to
5 prevent unintentional dislodgement of the locking pin.
Mobile plant working near panels and braces is to be
5 kept to a minimum at all times.
Where plant is required to work near panels and braces
the following controls are to be in place:
- Use of a spotter to signal to the plant operator to stop
the plant in the event of any part of the plant
approaching a brace or panel;
- The use of a hazard tape ‘para-webbing’ and / or signage
to make the brace position obvious;
5
The use of plant that reduces the risk of contact with panels
or braces such as the use of a mobile crane located where the
slewing cannot make contact with a brace or panel or the use
of a boom-type EWP to erect steel etc.
C 4 E 4 Safe access is to be provided for the dogger such as: Hutchinson D 4 H
Falls from heights
18 - Ladder access up onto the truck body to rig panel up to a Builders Site 14
height of 2 metres Foreman
- Edge Protection via centre ladder over a truck
- Use a step down semi when panels are transported
Licensed
vertically with specially designed panel ladder Dogger
- Pre-attached slings on the panels that can be reached
from the dogger while standing on the ground;
- A Boom lift, scissor, mobile scaffold or platform ladder
use to disconnect rigging or bracing ;
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 26
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.