SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
Responsible
H Controls / Work Methods Residual Risk
Person/s for
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Monitor & L C R
C 5. Admin 6. PPE Review
Braces – whenever possible should be attached to the
concrete panel prior to lifting (reduced the need for
persons to work at height ad minimises the time the
panel is supported by the crane).
Lifting clutch release lines are to be fitted so that the
clutches can be disengaged without the need for
workers to climb on top of the panel.
C 5 E 5 Each panel is to be lifted so that is leans away from the Hutchinson E 5 H
Crane Rollover and failure
22 crane. Builders Site 15
‘Suicide lifting’ (where the panel tilts towards the crane) Foreman
is not to be undertaken.
Crane
A mobile crane is to be set up in accordance with the Operator
manufacturer’s requirements (using outriggers fully
extended and supported by timbers to stabilise and
distribute the load).
A mobile crane set up area is to be checked for unstable
ground and not set up on areas identified as unstable.
A mobile crane is to be set up on level ground and not
on an angle greater than 1 degree unless written
evidence is provided by a competent person such as the
crane manufacturer or engineer with relevant
experience.
A crane is to be of an appropriate type and capacity to
safely lift the required mass of the panels – the weight
of the panel must be verified, and the operator must
Crane
check the SWL of final placement before the lift
Operator
commences.
A tower crane must lift within the SWL of the intended
radius to place the panels or other concrete elements.
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 27
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.