                                                                           SWMS:18 – A Pre Cast Panel Erection – N/A
Safe Work Methods
                                                                                                                                                         Responsible
                                                                                 H                      Controls / Work Methods                                          Residual Risk
                                                                                                                                                         Person/s for
          Job Steps                   Potential Hazards           L    C    R    O              1. Eliminate 2. Substitute 3. Isolate 4. Engineer         Monitor &       L    C     R
                                                                                 C                               5. Admin 6. PPE                           Review
                                                                                               Panel crew will use drill holes and mix and pour
                                                                                                grout, setting up shims and general panel assisting
                                                                                                duties.
                                                                                               All workers within exclusion zone will be required
                                                                                                to attend prestart talks and toolbox talks before all
                                                                                                activities commence. This will be a daily
                                                                                                requirement. If task methods change for different
                                                                                                areas a new prestart will be required will all
                                                                                                involved in task attending
                                                                                               A person being supervised by an intermediate
                                                                                                rigger will be place on a training log book when
                                                                                                involved in connecting and securing bracing to
                                                                                                panels and other concrete elements.
                                                                                               AT ANY STAGE WORKS CANNOT PROCEED WITHIN
                                                                                                THE SET CONTROLS ALL WORK MUST STOP AND
                                                                                                TASK MUST BE RE ASSESSED AND NEW APPROVED
                                                                                                CONTROLS PUT IN PLACE AND ALL WORKERS
                                                                                                INVOLVED IN THE TASK MUST ATTEND TOOLBOX
                                                                                                TALK TO BE BRIEFED / TRAINED ON THE NEW
                                                                                                CONTROLS.
                                                                  C    4     E    1            No lifting in rain or rain affected ground areas that   Hutchinson        E    4    H
Additional requirements for       Environmental issues
                                                                            18                  could cause the workers to slip or slide.               Builders Site               10
lifting Tilt-up panels cont.      affecting safe precast panel
                                                                                               Not to lift in wind conditions that could cause the     Foreman
                                  erecting
                                                                                                crane and panel to become unstable                      Crane
                                                                                                                                                        Operator




584 Milton Road TOOWONG QLD 4066                            SWMS Developed by:   Jamie Gilbert                                                               VERSION 9 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                         Position:            National Health & Safety Co-ordinator                                                          Page 29
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.