SWMS:24 – Working with Explosive Power Tools
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
bodily injury or property Anchor shaft to be the correct size to suite slot in
damage. brace foot and washer to be 40mm dia.
Concrete to reach 20-25 MPA before fixing brace
Lifting panels into position; Expose workers to B 5 E 5 Notify the adjoining public areas of the lift and Worker D 4 H
Crane size and reach failure during lift 24 exclude the risk by 1.5 times the height of the panel Licenced operator 14
Attach rigging to, panels sequence of crane or vacate areas until lift has finished.
Attach braces to panels capacity, panel, rigging Arrange a site meeting with crane supervisor to
Lift panel off casting bed gear, footings and select a crane capable in doing the lift.
Place panels onto concrete beams and lifting in Crane subcontractor to provide safe work method
footings ,beams and wall up windy conditions causing for crane operation and rigging sling.
stands death, serious bodily Qualification register to be completed prior to the
Lift panels in windy conditions injury or property lift sequence starting.
damage. Be aware of overhead hazards
Workers working around lifted B 5 E 5 A rigger or trainee (under supervision) are allowed Employer D 4 H
panels 24 to connect and disconnect, lift clutches and braces Site Foreman 14
Adjoining public areas, passing to and from the panels and deadman. Worker
vehicle traffic and passing Prepare footings and beams with locating holes to
pedestrians take panel location pins.
Workers are to stand clear during the lift off the
casting bed.
During the lift and manoeuvre of panels, only the
rigger and trainee are to guide the panel into
position.
During the placing of the panel workers are to take
directions from the rigger.
Do not lift or walk panels in windy conditions
exceeding 45km/hr
Bracing of panels; Expose workers to B 5 E 5 Install braces as per engineer’s bracing layout Worker D 5 E
Release of rigging before brace failure of bracing and 24 DWG”s. Licenced operator 19
are secure securing bolts resulting
in the panel to topple 4
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 6 – May 2014
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 90
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.