                                                                             SWMS:26 – Demolition of Structures - N/A
Safe Work Methods
                                                                                         H                    Controls / Work Methods                          Responsible           Residual
             Job Steps                     Potential Hazards             L   C   R       O            1. Eliminate 2. Substitute 3. Isolate 4. Engineer        Person/s for            Risk
                                                                                         C                             5. Admin 6. PPE                       Monitor & Review    L      C   R
                                                                                                  If required to work at height set up a stable work
                                                                                                   platform (mobile scaffold , trestle or scaffolding)
Mechanical demolition to remove;          Expose workers and            A   5   E      5         Consult a structural engineer to verify that the floors   Competent           D     4    H
 Placing plant on suspended               operators to risk of                                    are capable of sustaining static and operating loads      person
   floors to knock down internal           collapse of floor level               2                 with the plant.                                                                          1
   walls and clean-up to all levels.       due to weight of plant                5      4         Plan the movement between floors either by lifting                                       4
                                           being used causing                                      with crane or earth ramp.
                                           death or serious bodily                      5         To be assessed for the whole building not just one
                                           injury.                                      5          level.
                                                                                        5         Control dust by regularly watering down rumble.
   Before starting level by level                                                                Carry out a walkthrough of the building and confirm
    demolition                            Workers expose to death                      5          that not one is inside.
                                           if still working within the                            Carry out a head count of workers prior starting
                                           building at the same                         5          breaking method.
                                           time break down starts.                                Make sure that no one is on the ground in the pull
                                                                                                   down area.
   Breaking up concrete columns,       Expose operators of plant       B   5   E      5         Plan and consult with the plant operator to select the    Competent person    D      4   H
    beams, floors and external brick     to collapse of building                 2                 correct reach and size machine to carry out the                                          1
    walls to all levels above ground     onto plant causing death                5                 demolition safely.                                        Licenced operator              4
    level.                               or serious bodily injury.                      4                   o Excavator with Dinosaur breaker
                                                                                        4                   o Excavator with Rock breaker
   Breaking      up      concrete                                                      4                   o Excavator with Bucket
    components at ground level and                                                      5         Plan to systematically break up the building floor by
    below ground level.                                                                            floor until the ground level is reached.
                                                                                                            o External walls
                                                                                                            o Floors and internal beams
                                                                                                            o Columns and external beams
   Equipment to be used during the     Workers place at risk if        C   4   E      4         The following plant has been serviced and will be used    Competent           D     2    L
    demolition activities                the plant is not suitable               1                 in the demolition process;                                person                         5
                                         for the job.                            8                   o ….. tonne mobile crane – ( )
                                                                                                     o ….. Excavator / rock breaker – ( )                    Licenced
                                                                                                     o ….. Excavator / dinosaur – ( )                        operator
                                                                                                     o ….. Excavator / bucket ( )
584 Milton Road TOOWONG QLD 4066                            SWMS Developed by:       Jamie Gilbert                                                             VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005                         Position:                National Health & Safety Co-ordinator                                                      Page 101
ABN: 52 009 778 330

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.