SWMS:26 – Demolition of Structures - N/A
Safe Work Methods
H Controls / Work Methods Responsible Residual
Job Steps Potential Hazards L C R O 1. Eliminate 2. Substitute 3. Isolate 4. Engineer Person/s for Risk
C 5. Admin 6. PPE Monitor & Review L C R
If required to work at height set up a stable work
platform (mobile scaffold , trestle or scaffolding)
Mechanical demolition to remove; Expose workers and A 5 E 5 Consult a structural engineer to verify that the floors Competent D 4 H
Placing plant on suspended operators to risk of are capable of sustaining static and operating loads person
floors to knock down internal collapse of floor level 2 with the plant. 1
walls and clean-up to all levels. due to weight of plant 5 4 Plan the movement between floors either by lifting 4
being used causing with crane or earth ramp.
death or serious bodily 5 To be assessed for the whole building not just one
injury. 5 level.
5 Control dust by regularly watering down rumble.
Before starting level by level Carry out a walkthrough of the building and confirm
demolition Workers expose to death 5 that not one is inside.
if still working within the Carry out a head count of workers prior starting
building at the same 5 breaking method.
time break down starts. Make sure that no one is on the ground in the pull
down area.
Breaking up concrete columns, Expose operators of plant B 5 E 5 Plan and consult with the plant operator to select the Competent person D 4 H
beams, floors and external brick to collapse of building 2 correct reach and size machine to carry out the 1
walls to all levels above ground onto plant causing death 5 demolition safely. Licenced operator 4
level. or serious bodily injury. 4 o Excavator with Dinosaur breaker
4 o Excavator with Rock breaker
Breaking up concrete 4 o Excavator with Bucket
components at ground level and 5 Plan to systematically break up the building floor by
below ground level. floor until the ground level is reached.
o External walls
o Floors and internal beams
o Columns and external beams
Equipment to be used during the Workers place at risk if C 4 E 4 The following plant has been serviced and will be used Competent D 2 L
demolition activities the plant is not suitable 1 in the demolition process; person 5
for the job. 8 o ….. tonne mobile crane – ( )
o ….. Excavator / rock breaker – ( ) Licenced
o ….. Excavator / dinosaur – ( ) operator
o ….. Excavator / bucket ( )
584 Milton Road TOOWONG QLD 4066 SWMS Developed by: Jamie Gilbert VERSION 7 – September 2015
P: (07) 3335 5000 F: (07) 3335 5005 Position: National Health & Safety Co-ordinator Page 101
ABN: 52 009 778 330
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.