Project Roles and Responsibilities
HB-HSEQ-F-007
Version: 10
Title Start of Project Daily Weekly Monthly Periodically
- Set up site Hoardings & - Be available to resolve health - Ensure copies of – Incident - Ensure OHS targets are met - Ensure all personnel have
Amenities as per WHSMP – & safety issues as raised by Reports, CAR’s, Improvement and identified for site team general and site specific
Sections 4 & 5 team members or workers. Notices, Prohibition Notice members, induction.
- Set up site induction process - Liaise and instruct the HSO and Infringement Notices Refer WHSMP Appendix 5 - Review Subcontractor SWMS
Note: on the WH&S requirements generated – are sent to the - Participate in monthly walk with HSO.
Site Manager or Site Foreman to take
and tasks for the day. Contracts Administrator on a through with the Team - Review all incident
on HSO responsibilities if there is no
requirement for HSO or HS Rep - Review and provide weekly basis – with all Leader. investigations.
additional supervision as originals filed on site. - Sign off on Incident Reports
required for high risk tasks. - Attend HSE Committee Refer: MP:08 and HB-HSEQ-
- Refer to Site Managers Meetings and ensure F-027-B
Responsibilities effective operation and - Ensure underground services
HB-HSEQ-F-007-C. function of Committee are identified and located on
- Refer to Site Foreman Members. site and ensure subbies are
Responsibilities - Hold tool box talks with notified before excavation
HB-HSEQ-F-007-D. Subcontractors. commences.
- Review sub -contractor’s - Ensure 3 monthly reviews of
SWMS (when required). the WHSMP and PRA are
- Monitor resources and completed with the Site
allocate appropriately. Management Team.
- Ensure completion of quality - Ensure that HB employees
checklist including ITPs if are trained in company
applicable. SWMS.
- Ensure all environmental - Report to Team Leader and
controls have been Project Manager on any
maintained. outstanding health & safety
- Manage workload and issues not being effectively
resources to suit project managed on site.
programme. - Ensure all community
stakeholders are advised of
any potential disturbances.
Team HSE - Assist in the development of - Collation of Team HSE - Completion of 3 monthly HSE
Manager the WHS Management Plan Statistical Summary (HB- and O&T Audit (HB-HSEQ-F-
- Review and sign the HSEQ-F-049-B) and 046-A).
completed submission to Head Office. - Monitor the revision of the
- Relay incident / accident WHSMP on a 3 monthly Basis
- WHS Management Plan
information and alerts to the in accordance with WHSMP
- Project Risk Assessment project. requirements.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.