                                                                                                                                        Project Roles and Responsibilities
                                                                                                                                                                              HB-HSEQ-F-007
                                                                                                                                                                                 Version: 10


     Title               Start of Project                       Daily                            Weekly                            Monthly                         Periodically
                                                                                                                       - Review training needs for the   - Communicate all systems
                                                                                                                         project.                          updates to site in accordance
                                                                                                                       - Attend company forums /           with the Register of Project
                                                                                                                         meetings and relay all            Performance Measures (HB-
                                                                                                                         relevant information to site.     HSEQ-F-050).
                                                                                                                       - Support the HSE Corporate       - Attend the HSEQ Steering
                                                                                                                         Team in rolling out Health &      Committee Meetings and
                                                                                                                         Safety initiatives to the         relay relevant information to
                                                                                                                         project.                          site.
                                                                                                                                                         - Conduct OHSMS Internal
                                                                                                                                                           Audits for the project in
                                                                                                                                                           alignment with the Company
                                                                                                                                                           Audit Schedule.
Health &Safety   - Generate and file all OHS       - Conduct daily walk through      - Conduct weekly site             - Attend monthly project          - Provide tool box talks to
Officer (QLD)      records identified for the        inspections with actions          inspections.                      health and safety review.         Hutchinson’s employees on
HSE Co-            site.                             taken to ensure health and      - Conduct task observations       - Obtain scaffold inspection        OHS issues
ordinator        - All documents identified          safety standards are              against SWMS.                     reports and sign off.             Refer: OHS Procedure PP:06
(NSW)              within the WHSMP and OHS          maintained.                     - Review Plant and Equipment      - Participate in monthly walk       and HB-HSEQ-F-055
HS REP (other      Corporate Manual to be          - Conduct project site              Register and update.              through with the Team           - Provide training in
States)
                   available on site in files.       inductions.                     - Review public safety              Leader.                           Hutchinson’s SWMS’s to
                 - Assist in meeting OHS targets   - Review sub -contractor’s          measures including Traffic                                          employees. Refer: Appendix
                   identified for site team          SWMS.                             Management Plan and                                                 2.
                   members. Refer: Appendix 5      - Issue site Corrective Actions     signage.                                                          - Ensure all personnel have
                 - Assist in the development of      to sub-contractors for non-     - Attend and coordinate HSE                                           general and site specific
                   the WHSMP for the project.        conformance of OHS issues.        Committee Meetings.                                                 induction.
                                                   - Report to Site Manager and      - Collate copies of – incident                                      - Coordinate electrical
                                                     Site Foreman on                   reports, CAR’s, Improvement                                         inspections of RCDs/Switch
                                                     performance for the day.          Notices, Prohibition Notice,                                        Boards and temporary
                                                   - Review and if needed update       Infringement Notices                                                electrical wiring on a 3
                                                     the Hazardous Substances          generated – are ready to be                                         monthly basis.
                                                     Register (HB-HSEQ-F-040)          sent to the Contracts                                             - Review first aid supplies and
                                                     and Hazardous Training            Administrator on a                                                  check fire extinguisher during
                                                     Records (HB-HSEQ-F-040-B)         fortnightly basis – originals                                       inspections.
                                                   - Refer to Health & Safety          filed on site                                                     - Ensure SWMS are monitored
                                                     Officer Responsibilities (HB-     Refer: OHS Procedure MP:05                                          and evaluated.
                                                     HSEQ-F-007-E / F).

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.