Project Roles and Responsibilities
HB-HSEQ-F-007
Version: 10
Title Start of Project Daily Weekly Monthly Periodically
Project Quality - Develop the Quality - Assist the Site Manager in - Report on the effectiveness - Assist the Project Manager & - Respond to the client’s
Representative Management Plan with completing product of procedures and control Contract Administrator with requests for records and
(QPR) assistance from the Contract inspections. measures to site progress claims through record keeping
Administrator. - Arrange for external testing management. identifying completed lots requirements.
- Establish inspection and test authorities as required. - Ensure accuracy of forms and and sections of work and - Ensure all deliverables are
plans (as required) or other - Control the movement and records. subcontractor progress for achieved by the times
inspection processes. storage of records and - Provide data for entry into the project. identified in the contract
Note: documents. HSE Project Performance documents.
The Contract Administrator may take
- Assist the site team in Register HB-HSEQ-F-049 as - Ensure project quality audits
on PQR responsibilities if there is no
requirement for PQR. determining the corrective required. are completed and actions
and preventative actions for closed out as per audit
any non-conformity. schedule.
Project - Develop the Environmental - Carry out walk throughs of - Assist Site Manager & / or - Report environmental - Ensure environmental audits
Environmental Management Plan with the project to ensure HSO to complete weekly compliance and performance and inspections are
Representative assistance from the Project environmental compliance. inspection. to the Project Manager. completed.
Manager and Site Manager. - Provide assistance to the - Provide data for entry into - Carry out monitoring of
- Ensure Waste Management project team to help meet HSE Project Performance environmental impacts and
Plan and requirements are environmental expectations. Register HB-HSEQ-F-049 as implement control measures
identified and agreed with required. - Ensure all site personnel are
waste management appropriately trained in
contractor. environmental awareness
- Facilitate Aspect and Impact and facilitate/organise as
assessment with members of required.
site management team
Note:
The HSO may take on the
responsibilities of the Environmental
Representative if there is no
requirement for an Environmental
Representative.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.