Formwork & Concrete Placement Installation Checklist
HB-HSEQ-F-060
Version: 6
Area: _____________________________ Date: _____________________________
Level: _____________________________ Grids: _____________________________
DOCUMENTATION
ITEM check ITEM check
Yes/No Yes/No
Structural drawings for the single or multiple Design certification of building integrity of
suspended floor design has been design by previously constructed suspended floors to
an engineer and complies to AS 3600 support formwork activities
Formwork drawings show elevations, Footing design assumptions such as foundation
sections and general arrangement of material, safe bearing value, limitations on
formwork to support the structural single or settlement during erection, placing of concrete
multiple suspended floor design, has been and dismantling.
designed to comply to AS 3610
Formwork drawings are to be site specific Considerations of underground services such
and designed by a qualified engineer. as; compaction and drainage trenches.
Engineer certification of non-proprietary Where required location of weep holes,
equipment, design assumptions relating to vibrator holes, clean out holes and inspection
pour sequence, strength, stability and openings to be shown
stiffness
All variations to original design to be signed
off by engineer and marked-up on all
formwork drawings.
PLANNING
check check
ITEM ITEM
Yes/No Yes/No
Formwork plan to include specifications, Workers have been instructed in the safe
erection, placement of concrete and erection and dismantling and back propping
dismantling and back propping layout work methods.
Have changes been approved by the Is there safe access to and from the work areas
formwork designer and plans been changed. and edge protection provided?
Workers understand the design and erection Is there adequate lighting of the work areas.
methods.
Have storage areas been designated for safe Have measures been taken to prevent mobile
handling methods. plant from hitting the formwork.
Have supporting components been
inspected for defect, prior to arrival onsite
and/or erection? i.e. frames, props, bracing.
ERECTION
check check
ITEM ITEM
Yes/No Yes/No
Formwork has been assembled in Have all U heads or been check for alignment
accordance with the formwork plan. and correctly adjusted in height.
Formwork has been checked for defects, Have all bearers been check for correct
excessive wear in components positioning on the U heads
Is the false work area clean and free of Have all joist been checked for correct
obstructions placement on bearers
Formwork deck has been checked for gaps All ply up stands are correctly braced and
and loose ply sheets secure.
Have all the frames, braces, sole plates, base Has the formworker provided prior to placing
jacks, unbraced props, tie bracing have been concrete an inspection sheet signed by an
checked for correct alignment and engineer to verify the erection of the false
installation. work?
Have all angled false work been correctly Safe access around false work for adjustments
wedged and braced. during concrete pour.
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.