Formwork & Concrete Placement Installation Checklist
HB-HSEQ-F-060
Version: 6
STEEL FIXING
check check
ITEM ITEM
Yes/No Yes/No
Steel reo installed as per the structural Have all recesses, up stands, and penetrations
drawings for concrete member design been formed
Have all link steel reo for stairs, dowel inserts Post stressed beams to have fabric mesh placed
for cold joints been placed, and Tilt up panel over area to provide safe work area for
dowel connectors installed concreters to work on
Have all post stress cables and heads been Engineer to inspect and sign off steel reo
placed placement prior to pour
PLACEMENT OF CONCRETE
check check
ITEM ITEM
Yes/No Yes/No
Inspection sheet has been received from the Are workers experienced in the placement for
form worker ensuring that formwork assembly concrete on suspended formwork decks?
complies with formwork plans.
Previously installed back propping has been Are workers aware of the pour sequence and
check and complies to the formwork plan on maximum pour rates, especially vertical pour
multiple suspended floors rates?
Are formwork spotters in place with a workable Hoisting, and positioning of pumps units are
communication system where problems can be adequate to place concrete onto the deck in a
managed? safe and timely manner
If “No” is recorded, how was the issues rectified:
Signed off by:
_______________________ _____________________
Site Foreman Formwork Foreman
STRIPPING – to be actioned as the false work is being removed!
check check
ITEM ITEM
Yes/No Yes/No
Site manager/foreman has verified with the Are correct housekeeping principals being
engineer prior to instructing form worker to maintained.
commence stripping?
Have barricades / warning signs erected to Are stripped formwork components being
create an exclusion zone. stacked before relocation?
Is minimum stripping times being observed and Is back propping being installed as per the
monitored? formwork documentation?
Is stripping being carried out in a systematic Is back propping being checked after post-
manner tensioning processes.
Drop stripping process is prohibited on this site Is the subcontractor providing adequate
supervision of this work?
If “No” is recorded, how was the issues rectified:
Signed off by:
_______________________ _____________________
Site Foreman Formwork Foreman
_______________________
Site Manager
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.