                                         Formwork & Concrete Placement Installation Checklist
                                                                                                         HB-HSEQ-F-060
                                                                                                             Version: 6




STEEL FIXING
                                                    check                                                        check
                      ITEM                                                       ITEM
                                                    Yes/No                                                      Yes/No
Steel reo installed as per the structural                    Have all recesses, up stands, and penetrations
drawings for concrete member design                          been formed
Have all link steel reo for stairs, dowel inserts            Post stressed beams to have fabric mesh placed
for cold joints been placed, and Tilt up panel               over area to provide safe work area for
dowel connectors installed                                   concreters to work on
Have all post stress cables and heads been                   Engineer to inspect and sign off steel reo
placed                                                       placement prior to pour

PLACEMENT OF CONCRETE
                                                    check                                                        check
                      ITEM                                                       ITEM
                                                    Yes/No                                                      Yes/No
Inspection sheet has been received from the                  Are workers experienced in the placement for
form worker ensuring that formwork assembly                  concrete on suspended formwork decks?
complies with formwork plans.
Previously installed back propping has been                  Are workers aware of the pour sequence and
check and complies to the formwork plan on                   maximum pour rates, especially vertical pour
multiple suspended floors                                    rates?
Are formwork spotters in place with a workable               Hoisting, and positioning of pumps units are
communication system where problems can be                   adequate to place concrete onto the deck in a
managed?                                                     safe and timely manner
If “No” is recorded, how was the issues rectified:



Signed off by:
_______________________                                               _____________________
Site Foreman                                                          Formwork Foreman

STRIPPING – to be actioned as the false work is being removed!
                                                    check                                                        check
                      ITEM                                                       ITEM
                                                    Yes/No                                                      Yes/No
Site manager/foreman has verified with the                   Are correct housekeeping principals being
engineer prior to instructing form worker to                 maintained.
commence stripping?
Have barricades / warning signs erected to                   Are stripped formwork components being
create an exclusion zone.                                    stacked before relocation?
Is minimum stripping times being observed and                Is back propping being installed as per the
monitored?                                                   formwork documentation?
Is stripping being carried out in a systematic               Is back propping being checked after post-
manner                                                       tensioning processes.
Drop stripping process is prohibited on this site            Is the subcontractor providing adequate
                                                             supervision of this work?
If “No” is recorded, how was the issues rectified:


Signed off by:
_______________________                                               _____________________
Site Foreman                                                          Formwork Foreman
_______________________
Site Manager

                                                                                                              Page 2 of 2

Used in these records

About this file

File size
16.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

WHSMP.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.