Council archive · source document
Whsmp · OPW16/0021
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 500, section 1. The text section number identifies this passage in the reader.
Monthly Scaffold Inspection Checklist
HB-HSEQ-F-061
Version: 5
Form to be used for box
As part of Handover Certificate Monthly Maintenance Checks on Scaffold
Area: _____________________ _ ____ Date: ______________________ ____
Level: ______________________ ____ Grids: ______________________ ____
DOCUMENTATION
check check
ITEM ITEM
Yes/No Yes/No
Are scaffold drawings designed by an engineer or The Scaffold Safety Plan / Safe Work Method
scaffold designer? Showing elevations, sections and Statements for the safe erection and dismantling
general arrangement of scaffold and has been and handling of the scaffold is being implemented
designed to comply to AS 1576 Scaffold and AS to erect the scaffold
1576.1 General Requirements?
SCAFFOLD VICINITY
check check
ITEM ITEM
Yes/No Yes/No
Has public protection been provided during Is there sufficient control of vehicle movements?
erection and dismantling?
Have sufficient safe guards been provided against Is there sufficient control over crane movements?
electric power lines (within 4 metres)?
SUPPORTING STRUCTURE
check check
ITEM ITEM
Yes/No Yes/No
Is the condition of the supporting structure sound Is there a risk that the supporting structure will
and of adequate strength to support the scaffold change and affect future scaffold installation?
structure?
SOLEPLATES AND BASEPLATES
check check
ITEM ITEM
Yes/No Yes/No
Is the scaffold built on solid ground, if not are sole Are the base jacks supporting every standard?
plates used to distribute the load
Are the sole plates the correct size and number to Are the base jacks installed correctly and not
support the scaffold? extended too high?
Are the sole plates hardwood timber and in good Are the base jacks centred over the sole plates and
condition? secure from moving?
Are the sole plates secure and placed so they can’t
dislodge
SCAFFOLD STRUCTURE
check check
ITEM ITEM
Yes/No Yes/No
Are the standards bearing firmly, plumb and as per Are the lifts at the correct height and as per plan?
design?
Are the joints in standards correctly staggered and Are the ties placed and fixed correctly as per
secure to suite design? design?
Is the bay and end bracing installed correctly as per Is the maximum vertical gap between the hop up
design? and the slab 300mm or less?
PLATFORMS
check check
ITEM ITEM
Yes/No Yes/No
Does the scaffold have the required working Is there adequate edge protection, containment
platform and located as per design screens to all platforms and ends?
Are catch platforms correctly installed and at the Are decks placed and secured correctly into
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.