Monthly Scaffold Inspection Checklist
HB-HSEQ-F-061
Version: 5
required height from work surface transoms and hop ups?
Is the platforms size suitable for the intended work, Are decks and lap boards secured against high wind
as per plan conditions?
Is the platform and supporting scaffold structure Are lap boards or ply sheet overlapping 300mm at
suitable for the live duty loads intended? each end and are tied off on hop up brackets?
Are Loading bays signed with working load limits?
TIES AND RAKER TIES
check check
ITEM ITEM
Yes/No Yes/No
Are the correct number of suitable ties as per the Have ties been installed with a torque wrench and
scaffold plan? records maintained onsite?
Have check fittings been installed on all ties?
ACCESS AND EGRESS
check check
ITEM ITEM
Yes/No Yes/No
Is there safe access and egress to the work platform Are temporary ladders of an industrial grade
and installed to comply with the scaffold standard (120kg) and installed correctly?
and design?
Are temporary stairways correctly installed and no Is there adequate edge protection and screens
step to access stairs is over 300mm? where materials are carried?
CONTAINMENT SHEETING
check check
ITEM ITEM
Yes/No Yes/No
Has the scaffold been design to take the Are there any gaps over the standard requirements
containment sheeting? and tears in shade cloth?
Is the sheeting been correctly fitted and fixed to the Are all over laps correctly installed and fixed to the
scaffold? scaffold?
Does the containment sheeting extend more than 2
metres past the last tie?
GENERAL FITNESS FOR PURPOSE
check check
ITEM ITEM
Yes/No Yes/No
Is there adequate provision for manually handling Has the scaffold been designed to support all
and storage of components? attachments?
Is the clearance between the scaffold and adjacent Is there adequate protection from falling debris?
structure not over 225mm?
Were there any issues identified? If yes how were they corrected?
Inspection carried out by Licensed Scaffolder:
__________ ______________________ ______ __________________
Licensed Scaffolder (print name) Signature
Confirm that licensed scaffold has carried out inspection:
__________ ______________________ ______ __________________
Site Manager/Forman (print name) Signature
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
WHSMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.