Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Collapse of partially EXTREME 5 Contract Partner’s will ensure all persons involved in the mobilisation, commissioning, use, operation, Site
assembles piling rig maintenance, repair and testing, and the de-commissioning, dismantling and demobilisation, of plant are Management
provided with all available information relating to health and safety about the item of plant. Contract Partner
Risk to health (injury EXTREME 6 All personnel on site must wear minimum site PPE (high visibility clothing, safety footwear and hard hat Site
/ visibility of worker double up) as well as all PPE listed in approved SWMS. Management
to other trades) Contract Partner
Being struck by EXTREME 3 An exclusion zone will be established around piling works clearly delineating the pilling activities from all Site
powered mobile other plant on the project Management
plant Contract Partner
Fall from heights EXTREME 5 All work at heights to be completed using appropriate controls. Work at Height Permit to be issued for all Site
work at heights Management
Contract Partner
Falls (when EXTREME 3 Hole surrounds and hole covers are to be installed over for all open holes. Where required using suitable Site
inspecting rig, falling bunting and visual barricading is also to be implemented. Management
into pile holes or Contract Partner
excavations)
Debris falling from EXTREME 4 Suitable communication method to be implemented between offsiders and operator. Exclusion zone/s to be Site
heights established around spin off area to prevent workers being struck with flying spoil (clay, rock etc.) Management
Contract Partner
Falling loads EXTREME 5 When installing cages all lifting equipment to be attached and lifted correctly. All lifting equipment to be Site
tested tagged and listed on lifting register. Management
Contract Partner
Hydraulic oil / diesel EXTREME 5 Ensure rig crews have a spill kit in close proximity to the rig and are trained in spill clean-up procedures. Site
spill Management
Contract Partner
Review and Monitoring Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Project Hazard/Risk Assessment / Page 77 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.