13. Mobile Plant
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Planning Activity planning EXTREME 5 All tasks involving the use of mobile plant or equipment to have an approved SWMS in place. Site Management
and hazard
identification Contract Partner
Unsafe plant use EXTREME 5 All plant requiring registration to the relevant state authority will be so registered and evidence of registration provided Site Management
on site to Woollam upon request.
Contract Partner
Distraction EXTREME 3 The use of mobile phones whilst operation plant is not permitted. Plant operator
Where operators are required to access personal mobile phones, the plant is to be stationary with park brake engaged
and all operations ceased.
Exposed moving EXTREME 1 Any machinery brought onto site without adequate guarding will be: Site Management
parts
removed immediately; or
Isolated and clearly tagged/signed “Out of Service” or unsafe for use until appropriate guarding is installed, or the item is
removed from site.
Plant colliding EXTREME 4 Where there is a potential for mobile plant or vehicles to contact scaffolding, formwork, tilt-up panel bracing or similar Site Management
with bracing / load bearing structures, appropriate barricading will be installed/erected to prevent contact with the temporary
temporary structure / bracing. Barriers / Barricading to be substantial enough to withstand foreseeable potential impacts.
structures
Workers not EXTREME 5 Contract Partner’s will provide adequate supervision to ensure plant and equipment is used in accordance with Site Management
suitably licenced manufacturer's instructions.
or trained for the Contract Partner
activity
Workers not EXTREME 5 Contract Partner’s will ensure all persons involved in the commissioning, installation, use, operation; maintenance, repair Site Management
suitably licenced and testing, and the de-commissioning, dismantling and disposal of plant are provided with all available information
or trained for the concerning health and safety about the item of plant. Contract Partner
activity
Project Hazard/Risk Assessment / Page 78 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.