STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 322, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Workers not EXTREME 5 Contract Partner’s will be required to provide evidence of ‘competencies’ for operating plant or equipment upon Site Management
suitably licenced request. For all jobs requiring licences / tickets, the relevant certificate of competency must be sighted and copied by
or trained for the Woollam before persons undertake that work. Contract Partner
activity
Emissions EXTREME 5 Controls will be implemented to ensure the effective management of exhaust emissions (i.e. plant operating above Site Management
trenches and excavations and in confined / enclosed areas).
Contract Partner
Exposed moving EXTREME 3 All machinery on site will be provided with guarding around parts that move, pose a risk of entanglement, are excessively Site Management
parts hot / cold, have the potential to eject parts or transmit power.
Contract Partner
Plant failure EXTREME 5 Duties of PCBU are to carry out an assessment of the risks associated with the hazards when operating plant. A Mobile Site Management
Plant Checklist must be completed for plant & equipment to ensure that employers have assessed the fit for purpose to
operate the plant on site and comply with duties of employers for the management and control of plant. Contract Partner
Where plant is found to be noncompliant the plant shall.
Tagged out until the defective item/s has been fixed and or
Be removed from site
Plant failure EXTREME 5 Servicing schedules will be placed on the Woollam Site Equipment Register 056203 and in the site diary in Procore prior Site Management
to equipment being used on site. This register shows the service/ maintenance duration and date of the last service for
each item, for example. Contract Partner
Plant to be serviced as per manufactures servicing requirements – as a guide in conjunction Sec 29 of the WSHMP
Electric Tower Cranes: monthly inspection, then 3 monthly intervals.
Hydraulic Tower Crane – every 250 hours of service.
Mobile Crane – every 250 hours of service
Man & Material Hoist & Mash Climbers - monthly inspection.
Scissor Lifts & Boom Lifts - 3 monthly inspection.
Earthmoving equipment require servicing every 250 hours of service.
Piling Rig – 200 hours
Mobile Concrete Boom, line Pumps and Satellite Boom – 200 hours
Project Hazard/Risk Assessment / Page 80 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.