Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Forklift – 250 hours.
Generator – 250 hours
Struck by plant EXTREME 5 A plant and pedestrian management plan will be incorporated either into the site induction lay out plan or a separate site Site Management
movements plan lay out showing the following interaction.
Contract Partner
separation of pedestrians to plant movements - where possible
erection of plant speed limit, watch out for pedestrian signs and directional signs.
Signed “Safe Walk Holding Areas” to allow plant to go pass where persons and plant use the same travel and access path.
Identifying material unloading and loading storage area – this may be one in the same area.
Identifying Contract Partner container storage areas
Mobile Crane and Concrete Boom Pump set – site team to verify that the set-up area to stable to support the activity
undertaken – Geotechnical Report to be reviewed.
Identifying signage that deliveries are to report to the site office.
Identifying the use of spotters when plant and pedestrians cannot be separated.
Identifying the use of spotters when moving a load when travel path vision is restricted.
A spotter must not undertake any task other than spotter and have clear line of vision and communication with driver.
Plant failure EXTREME 5 Owners of Plant requiring inspections to the relevant state authority will provide evidence of completed inspection tests Site Management
to Woollam upon request for.
Contract Partner
Tower Cranes
Mobile Cranes
Mobile Concrete Boom Pump
Satellite Concrete Boom Pump
Concrete line pump
Piling Rig
Forklift
EWP/Scissor lifts
Project Hazard/Risk Assessment / Page 81 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.