Skip to the record
Accept no substitutions.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 323, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                     Residual
                                                                                                        Proposed Controls




                              Rating
                              Initial




                                            HOC
                               Risk




                                                                                                                                                                                       Risk
Activity         Risks                                                                                                                                                                          Responsible Person
                                                                             (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)


                                                  Forklift – 250 hours.
                                                  Generator – 250 hours

           Struck by plant   EXTREME    5         A plant and pedestrian management plan will be incorporated either into the site induction lay out plan or a separate site                    Site Management
           movements                              plan lay out showing the following interaction.
                                                                                                                                                                                                Contract Partner
                                                  separation of pedestrians to plant movements - where possible
                                                  erection of plant speed limit, watch out for pedestrian signs and directional signs.
                                                  Signed “Safe Walk Holding Areas” to allow plant to go pass where persons and plant use the same travel and access path.
                                                  Identifying material unloading and loading storage area – this may be one in the same area.
                                                  Identifying Contract Partner container storage areas
                                                  Mobile Crane and Concrete Boom Pump set – site team to verify that the set-up area to stable to support the activity
                                                  undertaken – Geotechnical Report to be reviewed.
                                                  Identifying signage that deliveries are to report to the site office.
                                                  Identifying the use of spotters when plant and pedestrians cannot be separated.
                                                  Identifying the use of spotters when moving a load when travel path vision is restricted.
                                                  A spotter must not undertake any task other than spotter and have clear line of vision and communication with driver.

           Plant failure     EXTREME    5         Owners of Plant requiring inspections to the relevant state authority will provide evidence of completed inspection tests                     Site Management
                                                  to Woollam upon request for.
                                                                                                                                                                                                Contract Partner
                                                  Tower Cranes
                                                  Mobile Cranes
                                                  Mobile Concrete Boom Pump
                                                  Satellite Concrete Boom Pump
                                                  Concrete line pump
                                                  Piling Rig
                                                  Forklift
                                                  EWP/Scissor lifts




                                                                                                                                   Project Hazard/Risk Assessment / Page 81 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.