STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 324, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Damage to vision EXTREME 5 Lasers used on Woollam projects are to comply with AS 2211. Calibration records are to be retained by the owner. Site Management
Contract Partner
Damage to vision EXTREME 5 Signage notifying other workers of laser use is to be erected in the work area Site Management
Contract Partner
Emergency EXTREME 5 The emergency procedures relating to plant will be displayed in a manner that can be observed by persons who may be Site Management
response exposed to risks from the operation of the plant.
Contract Partner
References AS 2211 – Safety of laser products
PP 07: Plant and Equipment on site Appendix 1
Review and Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Monitoring
13.1 Elevated Work Platforms (EWP)
Planning Rollover of EWP EXTREME 1 EWPs will not be used as cranes. Site Management
Contract Partner
Risk identification HIGH 5 Prior to use operators are to obtain relevant Working at Heights Permits Site Management
Contract Partner
Activity planning HIGH 5 All tasks involving the use of EWP equipment are to have an approved SWMS in place which considers the task hazards Site Management
and hazard and controls.
identification Contract Partner
Instruction and HIGH 1 Persons who are not appropriately licenced will not be permitted to operate EWPs in accordance with Minimum Site Management
training Licencing Requirements SEC 29 WHSMP.
Contract Partner
Operator’s certification (licence) will be sighted and copied (where there is a facility to do so) at induction. Training must
be provided by an accredited RTO.
Project Hazard/Risk Assessment / Page 82 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.