Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Use Falling objects HIGH 3 Exclusion zones with signage and barricades will be erected around the EWP work area as determined by risk Site Management
assessment.
Contract Partner
Faulty plant HIGH 4 Out of level audible and / or visual alarms will be fitted to EWPs without level limiting switches. Site Management
Contract Partner
Faulty plant HIGH 5 Logbooks are to be maintained with daily pre starts and servicing recorded in logbook. Logbooks are to be kept on each Site Management
EWP and available for inspection.
Contract Partner
Objects / persons HIGH 5 No persons will exit from the bucket or platform at height unless a risk assessment is carried out and suitable precautions Site Management
falling are in place to ensure the safety of persons in the bucket / platform and structure.
Contract Partner
Access HIGH 5 Where an EWP is used for access, it will be used only for that purpose and will not be moved away from the building. Site Management
Contract Partner
Falls HIGH 6 Operators will wear a full body harness connected to the anchor point within the basket whilst in operation of an EWP Site Management
Boom Lift. The operator to hold a high-risk license to operate where the boom length is 11m or more, or a yellow card
where the boom length under 11m. Contract Partner
Contact with HIGH 5 Safe approach distances will be determined by plant operators and/or the Site Supervisor using the relevant state Site Management
overhead legislation, COP and Australian Standards prior to any work commencing near overhead power lines.
obstructions / Contract Partner
electrical lines. No worker, equipment or EWP will be required to enter the exclusion zone around power lines.
Worker injury
Faulty plant HIGH 5 Mobile Plant Checklist to be completed when an EWP is brought onto site. The initial plant prestart will be approved by Site Management
Woollam site management, and a plant sticker will be placed on the EWP.
Contract Partner
Objects / persons HIGH 1 Controls for falling objects shall be implemented to prevent falling objects. Wrist straps or rope lanyards will be used to Site Management
falling secure tools to persons or work platforms to prevent Falling objects.
Contract Partner
Worker injury HIGH 5 All workers required to use personal fall protection equipment are to be competent in the inspection, use and Site Management
maintenance of such equipment.
Project Hazard/Risk Assessment / Page 83 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.