Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Contract Partner
Rollover of EWP HIGH 5 Prior to the use of the EWP all excavations and underground services are to be identified. Mobile plant and materials will Site Management
be kept back from the edge of excavations or underground services outside the zone of influence, to prevent the EWP
Persons being falling into the excavation or causing a cave in. Contract Partner
crushed in plant
Worker injury HIGH 5 Rescue plan including familiarisation with the emergency lowering controls shall be determined and communicated to all Site Management
workers involved prior to the use of EWP.
Contract Partner
References Managing Mobile Plant COP
Review and Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Monitoring
13.2 Mobile Crane
Planning for the use Plant not suitable EXTREME 5 Mobile Plant Checklist to be completed prior to use on site. Site Management
of mobile cranes for use
Collision with EXTREME 5 Cranes will be positioned to minimise the need for other plant to operate within the crane’s operating radius. Site Management
other cranes /
structures Contract Partner
Crane instability / EXTREME 5 Information to be provided to the crane supplier prior to commencement of work on site includes: Site Management
overturn
DCP reports for working areas.
location and details of underground cavities
location and details of underground services
location and details of excavations
locations of embankments and soft surfaces
potential overheard structures / services
necessary load/working requirements.
any information on ground bearing capacity that is available to Woollam.
Project Hazard/Risk Assessment / Page 84 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.