STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 336, section 1. The text section number identifies this passage in the reader.
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Ground HIGH 3 Ground compaction test to confirm ground conditions meet the requirements of the approved scaffold design. Site Manager
conditions
Working near EXTREME 4 Risk assessment to be conducted prior to erecting scaffold within 4m of low voltage overhead powerlines. Site Management
energised Contract Partner
Asset owner advice to be obtained in advance of scaffold erection.
overhead
powerlines In accordance with asset owner’s advice, trained electrical spotters to be engaged for erection and dismantle where scaffold
installation is within 4m of low voltage overhead powerlines or risk assessment requires a spotter.
Ply hoarding to be installed in accordance with asset owner’s advice when is installed within 4m of overhead low voltage power.
(Safe Work Australia)
Project Hazard/Risk Assessment / Page 94 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.