Skip to the record
The gold standard in government transparency.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 337, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                    Residual
                                                                                                                                                                                                                  Responsible




                                       Rating
                                       Initial
                                                                                                                   Proposed Controls




                                                 HOC
                                        Risk




                                                                                                                                                                                                      Risk
     Activity          Risks
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                               Person

Pre-             Activity planning     HIGH      5     All tasks involving the erection, altering or dismantling of scaffold to have an approved SWMS in place and are to that will address                    Site Management
commencement     and hazard                            task hazards and controls.                                                                                                                              Scaffold Contract
on site          identification                                                                                                                                                                                     Partner

                 Workers not           HIGH      5     Scaffolder’s certification (licence) is to be sighted at induction, scaffolders to be suitably licenced in accordance with Legislative                  Site Management
                 suitably licenced                     requirements see Sec 30 WHSMP High Risk Work                                                                                                            Scaffold Contract
                 or trained for the                                                                                                                                                                                 Partner
                                                       Scaffolding tasks including design, erection, modification, or inspection will not be undertaken by persons who do not hold the
                 activity                              appropriate qualification / certification to do those tasks

Design Changes   Adequacy of          EXTREME    1     Design changes to be approved by the relevant scaffold person (RPEQ engineer, scaffold designer etc).                                                   Contract Partner
                 design                                                                                                                                                                                        Site Management
                 Scaffold collapse




Erection/        Falling object        HIGH      4     A combination of the following shall be implemented to prevent unauthorised access or injury from falling objects:                                      Site Management
modification/                                                                                                                                                                                                  Scaffold Contract
                 Falls from                            - Exclusion zones with signage, barricading and/or spotters will be established around the scaffolding and adjoining areas.                                  Partner
                 heights                               - Scaffold fans / hoardings / gantries may be used.


                                                                                                                                                  Project Hazard/Risk Assessment / Page 95 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.