Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Pre- Activity planning HIGH 5 All tasks involving the erection, altering or dismantling of scaffold to have an approved SWMS in place and are to that will address Site Management
commencement and hazard task hazards and controls. Scaffold Contract
on site identification Partner
Workers not HIGH 5 Scaffolder’s certification (licence) is to be sighted at induction, scaffolders to be suitably licenced in accordance with Legislative Site Management
suitably licenced requirements see Sec 30 WHSMP High Risk Work Scaffold Contract
or trained for the Partner
Scaffolding tasks including design, erection, modification, or inspection will not be undertaken by persons who do not hold the
activity appropriate qualification / certification to do those tasks
Design Changes Adequacy of EXTREME 1 Design changes to be approved by the relevant scaffold person (RPEQ engineer, scaffold designer etc). Contract Partner
design Site Management
Scaffold collapse
Erection/ Falling object HIGH 4 A combination of the following shall be implemented to prevent unauthorised access or injury from falling objects: Site Management
modification/ Scaffold Contract
Falls from - Exclusion zones with signage, barricading and/or spotters will be established around the scaffolding and adjoining areas. Partner
heights - Scaffold fans / hoardings / gantries may be used.
Project Hazard/Risk Assessment / Page 95 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.