STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 338, section 1. The text section number identifies this passage in the reader.
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
dismantle of - Co-ordination of scaffold works will be erected / dismantled during quiet times of the day.
scaffold - The bombing of scaffold components is not allowable during erection or dismantle.
- Tethering of tools and components when it is not possible to exclude adjoining areas
Falling objects HIGH 5 Mesh used from perimeter screening will comply with the requirements of the relevant legislation / COP / Australian Standard. Site Management
Scaffold Contract
Partner
Scaffold collapse HIGH 5 After erection / modification of any scaffold (excluding mobile scaffolds under 4m high), the Contract Partner erecting / modifying Site Management
the scaffold will provide a handover certificate. Scaffold Contract
Partner
Unauthorised HIGH 4 If a scaffold is incomplete or unsafe, and left unattended, the scaffold shall be excluded with the use of ‘Scaffold Incomplete’ signs Site Management
access or use and stop ends will be used to prevent unauthorised access onto the scaffold. Scaffold Contract
Partner
Falling objects HIGH 5 Gaps between the structure and scaffold shall not exceed 225mm horizontally, or 300mm vertically. Site Management
Scaffold Contract
Partner
Inspecting Incomplete HIGH 5 All Handover Certificates will notate the design drawing and the relevant Australian Standard to which they have been Site Management
scaffold handover constructed. Scaffold Contract
documentation Partner
A Handover Certificate will be received for all scaffold structures and loaded to Procore in conjunction with a marked Scaffold
Plan indicating the area being handover.
Where a Contract Partner has their own handover certificate this can be retained with the Woollam form and marked map.
Handover documentation is to be received prior to first use of the scaffold
Scaffold collapse HIGH 5 The frequency of inspections may vary depending on weather and site conditions, the type and size of the scaffold and the risks Site Manager and
associated with scaffold collapse. Scaffold
Contractor
The scaffold and its supporting structure are inspected by a competent person:
(a) before the scaffold is used (Handover Certificate)
(b) before use of the scaffold is resumed after an incident occurs that may reasonably be expected to affect the stability of the
scaffold (Handover Certificate)
(c) before use of the scaffold is resumed after repairs (Handover Certificate)
(d) at least every 30 days Scaffold Inspection as found on Procore
Protection of Mobile plant and HIGH 4 Barricade exclusion zone will be erected to prevent vehicle contact with erected scaffolding in areas where there is vehicle traffic Site Management
scaffold during traffic closer than 1.5 meters from the face of the scaffold.
construction
works
References AS/NZS 1576 Scaffolding
AS/NZ 1576 .1:2019 – Scaffolding – General requirements
Scaffolding COP 2021
Project Hazard/Risk Assessment / Page 96 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.