STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 344, section 1. The text section number identifies this passage in the reader.
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Falling objects EXTREME 5 Prior to use operators are to obtain relevant Working at Heights Permit. Site Management
Contract Partner
Falls from height
Injury to worker EXTREME 5 Rescue plan shall be determined and communicated to all workers involved prior to the use of Mast Climber. Site Management
from inadequate Contract Partner
emergency
response
Review and Safety Interaction, Task Observation, Monthly Audit as per Procore Inspection Matrix.
Mentoring
Project Hazard/Risk Assessment / Page 102 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.