Skip to the record
The only place to find full transcripts.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 344, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                           Residual
                                                                                                                                                                                                                        Responsible




                                       Rating
                                       Initial
                                                                                                                         Proposed Controls




                                                       HOC
                                        Risk




                                                                                                                                                                                                             Risk
    Activity         Risks
                                                                                            (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                               Person

               Falling objects     EXTREME             5      Prior to use operators are to obtain relevant Working at Heights Permit.                                                                                Site Management
                                                                                                                                                                                                                      Contract Partner
               Falls from height

               Injury to worker    EXTREME             5      Rescue plan shall be determined and communicated to all workers involved prior to the use of Mast Climber.                                              Site Management
               from inadequate                                                                                                                                                                                        Contract Partner
               emergency
               response

Review and     Safety Interaction, Task Observation, Monthly Audit as per Procore Inspection Matrix.
Mentoring




                                                                                                                                                        Project Hazard/Risk Assessment / Page 102 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.