Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18. For information about prescribed tidal work refer to Guide 24. Ifyou answered “YES” to Q12, the application triggers referral to the Port Authority, The Port Authority is a concurrence agency if the development is ~ ® within 200m of a shipping channel of an entry and exit shipping corridor for the port © within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage or spoil grounds; * within 1000m of a planned port facility identified in a land use plan approved under the Transport . Infrastructure Act 1994. In all other situation the Port Authority is an advice agency, Marinas For more information refer to Guide 18. For information about whether @ marina is prescribed tidal work refer to Guide 24, The local government is the assessment manager for all prescribed tidal work, . Ifyou answered "YES" to Q13, the application triggers referral to Queensland Fire and Rescue 12. 13, IDAS Assessment Checklist, Version 18.0, 10 November 2006 Does the application involve development below high water mark'9 and within the limits of a port under the Transport infrastructure Act 1994? NO - Ho — complete Part M of Form 1, o€ Part P of Form Pif the work is prescribed tidal work Does the application involve operational work that is tidal work for a marina2° with more than 6 vessel berths? Mino (17 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work Service as an advice agency. Tidal works in strategic port land tidal} 14. Dogs the application involve tidal works within a strategic port land tidal area"? areas NO For more information refer to Guide 18, O YES - complete Part M of Form 1 Unless you answered "NO” to Q14, the relevant Port Authority is the assessment manager for the application and the Environmental Protection Agency (EPA) and Queensland Transport (QT) are concurrence agencies for the application. Heritage 15. Does the application involve development in a heritage registered place as defined under the For further information refer to Guide 19, "Queensland Heritage Act 1992? If you answered YES" to Q15, the application triggers referral to the Queensland Heritage Council (No as concurrence agency for the application. O YES - complete Part C of Form 1 Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and For more information, including a list of the declared involves: (tick the applicable box/es) . catchment areas within Queensland, refer to Guide 7 a + ‘ . oo 43. (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares; Unless you answered ‘none of the above" to 016, OO (i) development assessable against the planning scheme involving the establishment or the application requires assessment by the . . . . Depariment of Natural Resources Mines and Water expansion of a waste water disposal system, other than a disposal system for carrying (NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994; If an agency other lhan NRMW is the assessment ae manager for the application, NRMW is a wily none of the above concurrence agency for the application in relation to this matter. Contaminated land 17. The application involves: (tick the applicable box/es) Applications involving materia! change of use and/ of reconfiguring a tot may trigger this referral. For more information refer to Guide 5. Unless you answered ‘none of the above’ to Q1?, the application requires assessment by the Environmental Protection Agency (EPA). if an agency other than EPA is the assessment manager for the application, EPA will be a concurrence agency for the application in relation to this matter. C1 (i) reconfiguring a tot for which all of part of the premises are — (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - « item 5, including the exemption otherwise provided for by paragraph (d); « item 6, including the exemption otherwise provided for by paragraph (e); or « item 7, including the exemption otherwise provided for a mining activity or petroleum activity; or (b) in an area for which an area management advice has been given for unexploded ordnance - complete Part N of Form 4 O (i) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises is in an area for which an area management advice has been given for unexploded ordnance - complete Part N of Form 1 . [7 (ii) none of the above 19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring lide. 20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995. 21 Strategic port land tidat areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.