Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                             - Project information sheet

                                                                             - Project Q&A sheet

                                                                             - Rock oyster fact sheet

                                                                             - Project Brief (restoration sites
                                                                             and designs)

                                                                             - Project FAQs (conversational
                                                                             edition)

                                                                             - Oyster Biosecurity fact sheet


(A1.5) Annual project            3 six monthly       First        On track   This document is the last of
reports and final reports        status updates      Report: 31              three 6 monthly reports
each of which address, at a      submitted     to    January                 submitted
minimum:                         Noosa Council       2020
Activities undertaken                                                        Six Monthly Report 1
during the subject                                                           Six Monthly Report 2
financial year, status and                                                   Six Monthly report 3 (this one)
progress against
deliverables, budget             3 annual reports    For each     On track   Two of three annual reports have
progress, income and             submitted     to    annual                  been submitted.
expenditure, report              Noosa Council       report -
against monitoring and                               yearly                  Annual Report 1
evaluation program and                                                       Annual Report 2
measurable outcomes and
outline of proposed
upcoming works/activities
for future period.

(A2.1) Oyster reef               1 Habitat           30 June      Achieved   Habitat Suitability Model +
restoration suitability          suitability model   2020                    refined Restoration Suitability
model incorporating              developed which                             Model developed.
physical parameters of           incorporates
oysters and public and           industry, Kabi                              Previously reported:
industry usage, access etc.      Kabi and public
to identify priority sites for   interests                                   1 restoration suitability model
restoration.                                                                 developed as well as associated
                                                                             habitat suitability model and
                                                                             socio-economic suitability
                                                                             models.

                                                                             1 restoration suitability
                                                                             presentation
(A2.2) Obtain necessary          1 set of ‘all’      30 June      Delayed    Permit applications submitted:
State Government                 relevant state      2020                         -   Owners Consent
permits/authorities              permits for                                      -   Resource Allocation
including resource               oyster reef                                          Authority
                                 restoration in
                                                                                                                  13
Log in to download the original file

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.