Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                                         •    Grenny’s Noosa by the
                                                                              River

                                                                     TNC established a senior schools
                                                                     and indigenous engagement
                                                                     project with Noosa
                                                                     Environmental Education Hub
                                                                     (EEHub).

                                                                     TNC has established a junior
                                                                     schools and indigenous project
                                                                     with Noosa Biosphere
                                                                     Community Association (NBCA).

                                                                     TNC is working with Tewantin
                                                                     Bushcare to establish a foreshore
                                                                     demonstration project at
                                                                     Tewantin

                                                                     TNC has agreed with Noosa and
                                                                     District Landcare (NDL) to
                                                                     provide training opportunities
                                                                     for Kabi Kabi Youth once oyster
                                                                     beds are laid.

                                                                     TNC collaborates with Ozfish to
                                                                     collect underwater footage of
                                                                     the Noosa River and is planning
                                                                     actions to educate fishers about
                                                                     oyster ecosystem restoration
                                                                     and the value of conserving and
                                                                     restoring river riparian and
                                                                     aquatic habitats.

(A4.1) Restoration at two    1 approval from     30 June   Delayed   Full reef build planned for winter
sites (approx. 40m-50m       Noosa Council       2021                2022
shore length per site)       secured to
which test reef design and   restore 2+ trial
construction and oyster      restoration sites
growth and survival.         in the Noosa
                             River estuary

                             2+ sites
                             recovered with
                             at least overall
                             80 m shore
                             length of reef
                             constructed

(A4.2) Restoration across    1 approval from     30 June   Delayed   Full reef build planned for winter
multiple further sites, as   Noosa Council       2022                2022
determined by habitat        secured to
suitability modelling and    restore an
                                                                                                          15
Log in to download the original file

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.