18.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply, sewerage,
      footpaths, kerbing, landscaping, street furniture etc.) are protected against any damage or
      interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its Consultants
      or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out
      the engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager
      Land Development and shall forthwith rectify the damage to that property or facility at its cost
      and to the satisfaction of the Manager Land Development.
      All rectification works are to be completed prior to the commencement of the use or,
      alternatively, the Applicant may request the Council to carry out the rectification work at the
      Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
      commencement of the use.
      In the case of any emergency the Council shall be entitled to rectify such damage at the cost of
      the Applicant, such cost being paid prior to the commencement of the use.
19.   The development of the site shall be carried out in such a manner as to prevent dust and/or
      sand nuisance to residents and/or tenants in the vicinity of the development.
20.   Construction work and other associated activities are permitted only during the hours of 7.00 am
      and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
      where extended hours are approved by the Manager-Land Development or his nominee.
21.   All signage, including that for safety during construction shall be in accordance with the Manual
      of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
22.   Safe pedestrian access on Hastings Street and beachfront pathway shall be maintained at all
      times. Should footpath / road closures be necessary to carry out construction works, Council’s
      Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
23.   Sediment and erosion control measures must be in place prior to works commencing. If such
      measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines
      can be issued if sediments from the site are found to enter or have the potential to enter
      Council’s stormwater system or natural waterways. Although the sediment and erosion control
      measures have been approved on drawing No. 1703-0-4, Council’s Manager – Land
      Development may request further controls to be installed should approved measures be
      inefficient.
24.   The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
      traps in accordance with the manufacturers specifications.
25.   The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps
      on a weekly basis and after each storm event.
      The owners of the subject property shall enter into an ongoing maintenance contract with a
      Registered Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on
      a regular three monthly cycle and on a “On Call” basis in the case of an emergency.
      The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be
      included in the Community Management Scheme for the completed development.
26.   All stormwater drainage lines including private drainage lines (also known as inter-allotment
      drainage lines) or as otherwise approved by Council’s Manager of Land Development shall be
      inspected by closed circuit television (CCTV) at the completion of all works and immediately
      prior to acceptance ‘On Maintenance’. Council’s Construction Technical Officer shall be advised
      of the timing of this inspection.




                                                                                      Page 4 of 9

Used in these records

About this file

File size
63 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2007.00001294.002 [As Published].pdf · 63 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.