Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
avoid adverse impacts; be required under the Nature
where adverse impacts Conservation Act 1992.
cannot be reasonably
avoided, they are The site has been located outside of
minimised. medium or high value koala
bushland.
(4) Ecological processes and
If any animal breeding places
connectivity is
(including tree hollows) are
maintained or enhanced
identified during construction,
by avoiding
appropriate measures will be
fragmentation of matters
undertaken.
of environmental
significance. All clearing activities will be
undertaken in accordance with nbn
(5) Viable koala populations construction management plans,
in South East Queensland including measures to avoid impacts
are protected by to fauna species, and vegetation
conserving and outside of the clearing footprint.
enhancing koala habitat
extent and condition.
Infrastructure (1) The outcomes of The nbn™ is an upgrade to
integration significant infrastructure Australia’s existing
plans and initiatives by telecommunications network. It is
all levels of government designed to provide Australians with
are considered and access to fast, affordable and
reflected, where reliable internet and landline phone
relevant. services.
The Government is committed to
(2) Development achieves a
completing the network and
high level of integration
ensuring that all Australians have
with infrastructure
access to very fast broadband as
planning to:
soon as possible, at affordable
(a) Promote the most
prices, and at least cost to
efficient, effective
taxpayers. To achieve these
and flexible use of
objectives nbn is rolling out a multi-
existing and planned
technology mix network and building
infrastructure
the network in a cost effective way
(b) Realise multiple
using the technology best matched
economic, social and
to each area of Australia.
environmental
benefits from To support the Fixed Wireless
infrastructure component of this network, nbn™
investment requires a fixed wireless
(c) Ensure consideration transmission site to provide fixed
of future wireless internet coverage to
infrastructure Cooran, with coverage extending to
needed to support parts of Pinbarren, Pomona and
infill and greenfield Traverston. The proposed fixed
growth areas wireless facility has been designed to
30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.