Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
(d) Optimise the location provide wireless broadband services
of future to surrounding premises in Cooran.
infrastructure within
communities to A search of the Radio Frequency
provide greater National Site Archive confirms that a
access to facilities viable co-location opportunity exists
and services and in the Cooran area. The closest
enable productivity existing facility to the proposed
improvements facility is a 25 m high Telstra tower
at 265 Tablelands Road, Cooran
(Figure 3.1).
(3) Development occurs:
(a) In areas currently
serviced by state In order to co-locate by replacement
and/or local of the existing facility, a stronger
infrastructure and and taller facility would be required
associated services; in order for nbn to achieve
or good/reliable service to the intended
(b) In a logical and community, whilst also
orderly location, accommodating Telstra, Vodafone
form and sequence and GWN’s existing and future
to enable the cost (reserved) equipment. A new facility
effective delivery of in this location would likely require a
state and local 50m lattice tower structure to
infrastructure to accommodate for the relatively
service lower ground elevation and to
development. ensure that the structural integrity of
the facility is maintained. A larger
lattice tower was not considered a
(4) Existing and planned desirable outcome, as it was
infrastructure is determined a new greenfield facility
protected from could be designed as a less obtrusive
development that would 35 m monopole to provide service to
compromise the ability of the community.
infrastructure and
A suitable location on the subject
associated services to
site has been selected and a lease is
operate safely and
in place. The proposed facility is
efficiently.
protected and will operate safely and
efficiently.
31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.