Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Overall Outcomes Compliance
and density commensurate with building landscape and built environment as the
height, bulk and scale to buffer existing mature vegetation will be retained
development and conflicting land uses; to act as a visual buffer.
f) enhances privacy between dwelling
units and accommodation units;
g) accommodates the outdoor recreation
needs of dwelling occupants; and
h) provides adequate vegetation
treatment to steep slopes and unstable
landforms.
The Development is considered to comply with the overall outcomes of the
Landscaping Code. For these reasons further compliance with the performance
outcomes of the Landscaping Code code is not considered necessary.
6.3.4.2.6 Natural Hazards Overlay Code
The subject site is identified as a ‘Landslide Hazard Area’ and ‘Medium Bushfire
Hazard area’ within the Natural Hazards Overlay. The Overall Outcomes relevant
to the subject site have been considered in Table 7.7.
Table 7.7 - Compliance with Overall Outcomes of the Natural Hazards Overlay Code
Overall Outcomes Compliance
a) development in areas at risk from Complies.
natural hazards is compatible with the
nature of the natural hazard; As the subject site is identified within the
‘Landslide Hazard Area’ of Council’s
b) the risk to people, property and the mapping, the Natural Hazards Overlay
natural environment from natural hazards Code applies to this application.
is minimised;
The location of the proposed facility is on
c) development does not result in a relatively flat land. Any disturbed acid
material increase in the extent or severity sulphate soil will be treated and managed
of natural hazards; and in accordance with the current Queensland
standards. Further geo-technical
d) for acid sulfate areas—the generation investigations will be conducted to
or release of acid and associated metal determine the extent of filling, excavation
contaminants into the environment is and the appropriate stabilisation
avoided. measures. Filling and excavation will not
result in land instability.
49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.