SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 NOVEMBER 2019
The below table identifies the estimated project costs and budget actions.
Item Cost (excl. GST)
Costs to date (October 2019) $1,455,736
Tendered Contract Value (ex. GST) $2,809,954
Consultant and staff costs $105,000
SUB TOTAL $4,370,690
CONTINGENCY $703,022
TOTAL BUDGET $5,073,712
Risks & Opportunities
FINANCE RISKS MITIGATION
Council request for scope increases. This is to be mitigated through Project Control
Group and Capital Works Executive management
and limitation of client requested scope variations.
Scope changes once construction commences Council acceptance of scope as awarded with
and project becomes publically visible. intention of not increasing scope.
Geotechnical conditions give rise for contractor Previous geotechnical investigations have been
claiming variation costs. considered and allowance for adverse latent
conditions is included in the contingency.
Contractor claims for variations based on costs for As above, this has been mitigated through the
environmental impact mitigation exceeds lump sum procurement method with further
allowances. mitigation through post tender clarifications tying
the contractor firmly into the agreed scope of
works
Clashes with underground services give rise for Majority of underground services have been
contractor claiming variation costs. relocated and those known have been mitigated
through design considerations.
Contingency amount being insufficient This risk may be mitigated through the adoption of
further value engineering to occur during the
construction phase process.
PROGRAM RISKS MITIGATION
There is the potential that the project is delayed The contractor is required to include “wet weather”
due to wet weather allowances into their schedule.
Construction takes longer due to site being more In the event of delays the contractor is able to
constrained than allowed. mobilise additional equipment at no additional cost
to bring program on track.
Resource risk PentaCon have nominated a capable team and
combining two work fronts (Portion 1 & 2) at one
time reduces the resourcing risks to this project.
The appointment of an internal superintendent
mitigates the resourcing risk for Council.
Page 38 of 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.