Original source · versioned page text
12. Code Assessment
Performance outcomes Acceptable outcomes Comment
AO6.5 suitable for access by emergency access vehicles and
Where an emergency access point is required, it complies personnel. Refer to Appendix B
with the relevant works codes and PSP6 Engineering
AO6.5 – Not applicable
Design Standards.
No required
Lot design
PO7 AO7 AO7 – Not applicable
Lot design and building siting minimises Each residential lot:
The proposed development is not a residential
bushfire hazard risk to people and
subdivision.
property.
1. includes a building envelope, identified on a
plan of subdivision;
2. is of sufficient size and shape to allow for
efficient emergency access to buildings for
fire fighting appliances (e.g. by avoiding
battle-axe/hatchet lots and long narrow lots
with long access driveways to buildings);
3. where more than 2500m², achieves setbacks
from hazardous vegetation in line with
Bushfire Attack Level 29 requirements as per
AS3959; and
4. is designed so
that buildings and structures are sited in
locations of lowest hazard within the lot and
elements of the development least
susceptible to fire are closest to the fire
hazard.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original