Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
FOOTING OFF SEi
AS DETAILED
—|
uL
my —_ — — 28b_
SHADING INDICATES
100 THICK SLAB,
SL82 MESH,
40 TOP COVER
SS
aT POS
IE
Yr
ZA) SF1
— 400d MASS CONC.
fa. WIDENING TO SUIT
DOWEL BARS 10
POOL SHELL @
200 CTRS.
POOL AS DETAILED
400d MASS CONC.
3-117 TRENCH WIDENING TO SUIT
MESH 2000Lg TO
ALL INTERNAL
CORNERS
50d SHOWER
RECESS AS
DETAILED
SFI
REFER TO ARCHITECTURAL SPECIFICATIONS
SF1 FOR ALL SET OUT DIMENSIONS, FINISHINGS,
FLASHINGS, WATERPROOFINGS, ETC.
FOOTING & SLAB ON GROUND LAYOUT
1:100 at A3
BRICK VENEER WALL AS SPECIFIED
R10 TIE BARS @ 600 CTRS
200 COG TO FOOTING
400 LAP WITH SLAB REINF.
SL82 MESH,
BRICK VENEER WALL AS SPEC.
R10 TIE BARS @ 600 CTRS 25 TOP COVER s
200 COG TO FOOTING
400 LAP WITH SLAB REINF. npn
SL82 MESH, Ss
25 TOP COVER ~
: 2-N12 TIE BARS. 600 LAP,
R 200 COG TO ADJACENT FOOTING
S SLAB WITH VISQUEEN VAPOUR
+ BARRIER OVER (TYPICAL) 350 FOOTING SF1 AS DETAILED
3-L11 TRENCH MESH
50 COVER
350 SFI SBI
STRIP FOOTING DETAIL (SF1 SF1 /SB1 INTERSECTION DETAIL
aa NE ON NS RN
1:20 at A3 1:20 at A3
NOTES
1. This is the property of the engineer, and may not be used, copied,
of reproduced wholly, or in part without the express permission of
the engineer. infringement in any way may result in legal action.
2. Figured dimensions take precedence over scaled.
3. Verify atl dimensions on site.
emphrE
ENGINEERING wa
100 THICK SLAB. SL82 MESH
25mm TOP COVER (U.N.O.)
FOOTING SCHEDULE
350w x 400d R.C. STRIP FOOTING
350w x 400d R.C. SLAB BEAM
750w x 1500ig x 450d R.C. PAD
FOOTING
500w x 150d THICKENING
300w x 200d M.C. EDGE THICKENING
KEYED CONTROL JOINT AS DETAILED
GENERAL NOTES
1. ALL BEAMS TO HAVE Ni2 CORNER BARS
(500 x 500) TO MATCH REINF. AS
SPECIFIED. PROVIDE 2-N12 SPLICE BARS
(600 MIN. LAP) AT ALL BEAM JUNCTIONS
2. BASES OF ALL EXCAVATIONS TO BE
FINISHED SOUND AND FREE OF ANY
LOOSE MATERIAL PRIOR TO PLACEMENT
OF CONCRETE
ALL FOOTINGS TO FOUND INTO NATURAL
SURFACE BY MEANS OF DIRECT BEARING
ALTERNATIVELY PROVIDE 350% M.C.
BORED PIERS @ 2m CTRS TO FOUND 300
INTO NATURAL SURFACE
- TERMITE PROTECTION TO BE PROVIDED IN
ACCORDANCE WITH THE BUILDING CODE OF
AUSTRALIA AND OTHER RELEVANT CODES
. IF LARGE TREES ARE REMOVED DURING
SITE PREPARATION. THE VOIDS ARE TO
BE EXCAVATED, BACKFILLED &
COMPACTED WITH SUITABLE MATERIAL
SIMILIAR TO THE EXCAVATED MATERIAL
FILL COMPACTION NOTE
ALL IMPORTED MATERIAL TO BE APPROVED
GRANULAR FILL (100 MAX PARTICLE SIZE;
MIN SOAKED CBR=15) PLACED IN LAYERS
NOT EXCEEDING 200 AND COMPACTED TO
ACHEIVE NOT LESS THAN 98% MAX.
RELATIVE DRY DENSITY (STANDARD), OR
WITH AS 1289 WHERE TOTAL DEPTH OF
FILL EXCEEDS 400
CONCRETE GRADES
FOOTINGS -
SLABS -
N20 CONCRETE
N20 CONCRETE
SL82 MESH,
TIMBER STUD
FRAMING AS SPEC.
100
25 TOP COVER
2-N12 SPLICE BARS
MIN. 400 LAP
BEAM REINF
AS DETAILED
900
FOOTING OFFSET DETAIL
1:20 @ AZ
PROPRIETARY PRESSED
METAL KEY. 150 MIN
BEARING
200 COG TO FOOTING
400 LAP WITH SLAB REINF.
SS SE
ne oS ne
COMPACTED SANDBED UNDER
SLAB WITH VISQUEEN VAPOUR
BARRIER OVER
100
3-L11 TRENCH MESH
50 COVER
RIP FOOTING DETAIL + KEYED
CONTROL JOINT (SF1+KCJ)
1:20 at A3
SL82 MESH
100
SAND BED, ETC
AS BEFORE
EDGE THICKENING DETAIL (ET1)
1:20 at A3
TIMBER STUD
FRAMING AS SPEC.
SL82 MESH, sg,
25 TOP COVER
AS BEFORE
500
SLAB THICKENING DETAIL (TH1)
1:20 at A3
Approved:
>
+ SANDBED, ETC.
AS BEFORE
3-L11 TRENCH MESH
j<-J30_.4 50 COVER
SLAB BEAM DETAIL (SB1)
4:20 at A3
CONSULTING ENGINEERS Client: LEACH DEVELOPMENT GROUP
Dimer, earemeoneT Project: PROPOSED RESIDENCE
7
FAX O16
‘TROY MOBILE: 0413 108 149
EMAL:
ABN 21112761510
ACN 112761510
LOT 40 ASPERA PLACE,
NOOSA RETREAT
TB
TROY PAULSEN / RPEQ: 6990
R10 TIE BARS @ 600 ALT. CTRS.
Tt FOOTING AND SLAB ON GROUND
LAYOUT AND DETAILS
FOOTING BEAM REINF.
AS DETAILED
1-N12 CORNER
BAR. 500 LEGS
2-N12 SPLICE BARS 600
MIN. LAP, 200 COG
FOOTING BEAM REINF.
AS DETAILED
ee es |
fj |
JUNCTION CORNER
TYPICAL FOOTING JUNCTION DETAILS
£20 at A3
Yay BRICK PIER AS SPEC.
7 a BY ARCH
1-N16. CENTRAL
g L N16 STARTER BAR
| LAP 400 WITH COLUMN REINF.
Vi y COG 200 TO FOOTING
Y Y SL 82 MESH,
g O 40 TOP COVER
PSL. Z 4 YATRA
; nr R.C. SLAB, ETC. =
a AS DETAILED
@}—3-N12 U-BARS EACH WAY
50 COVER
750
x1500Ig
PAD FOOTING DETAIL (PF 2)
4:20 at A3
SL82 MESH Sq
25 TOP COVER =
300 MIN. LAP AT STEP SL82 MESH 2
25 TOP COVER
SANDBED, ETC.
AS BEFORE
100
SHOWER RECESS /
SLAB STEP DETAIL
1:20 at A3
Date JANUARY 2007| scate AS SHOWN
Job RefNo: | Drawing No: | Issue: |
SC-1188
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file