• The driver must also ensure sediment is not tracked off site. If this occurs, it
will be swept up and put back into on site sediment receptacle drum.
• Where possible, the delivery of concrete will occur within the site, using
small trucks, to ensure the risk of spillage contaminating the stormwater
system is minimised.
• If site access is restricted and the delivery of concrete must occur on the
street, appropriate sediment controls will be in place before pouring
begins.
• The builder/site manager will ensure that all appropriate sediment controls
are in place before the concrete pour starts.
• Any spillage that does occurred during the delivery procedure will be
swept up before removing the sediment controls and concrete spillage
will not be hosed into the stormwater system.
• Chutes, barrels, wheelbarrows and other equipment will be rinsed in the
site wash-down area.
• To minimise the amount of wash-down water generated, excess
concrete will be scraped off equipment before it is washed.
• Water in the wash down area will be contained and recycled as required
and not allowed to flow into the stormwater system.
• Excess concrete will be returned to the supplier’s depot.
• The chute contents will be washed into the sediment receptacle drum and
sealed with a lid before leaving the site.
▪ The drum will be secured onto the main frame of the vehicle
ready for transportation.
▪ The drum will be secured with a bracket that is easily
accessible to the operator.
▪ The drum will be removed from the bracket and the waste
water emptied into the designated treatment facility once the
truck returns to the yard with the wastewater containing
“We manage the trees that you care about and remove the trees you worry about”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.