64. Fire hydrants are to be provided throughout the development in accordance with Council
Engineering Design Standards and in accordance with Queensland Fire Service Standards.
65. The existing sewer rising mains that is located in the adjoining road reserve at the north of
the site and the ‘zone of influence’ (taken as the area within a 45-degree angle measured
from the invert of the sewer main to the finished surface level) shall be accurately located
and determined by a licensed Surveyor and shown on all plans submitted for Operational
Works approval.
Service Easements
66. If not already in place, a registered easement shall be created over any stormwater drainage
systems within the site that collect stormwater from a Council road or convey stormwater
from any adjoining property.
67. The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing
that the Title Deed and any easement documents will be lodged at the Land Titles Office and
any additional Titles Office forms or requisitions requiring the consent of Council will be
attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
Headworks Contributions
68. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts
will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
June 2005 until the date of payment.
Water Supply $419,854
Sewerage $258,718
TOTAL $678,572
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or
is cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
69. Fill shall be compacted to the requirements of AS3798-1996 ‘Guidelines on Earthworks for
Commercial and Residential Developments’. Any existing fill that does not meet the
requirements of this standard shall be removed prior to additional filling or building works
commencing.
70. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification and make recommendations on the type of foundation
system(s) best suited for the proposed development. This information shall be submitted to
the Council for assessment and approval prior to obtaining a Development Permit for
Operational Works.
Page 9 of 17
Document Set ID: 23615315
Version: 3, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132004 5744 13 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.