Minor Change Existing Approval 132004 5744 13 [As Published] · 132004.5744.13
49. All pathways and pram ramps (internal and external) shall be designed and constructed to
ensure pedestrian safety using non-slip materials and to produce an evenly graded surface
finish.
50. All redundant vehicular crossings to the site shall be removed and replaced by kerb &
channel, footpath paving and landscaping such as trees and grasses in accordance with
Council’s Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
51. A pathway contribution of $49,774 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the
Council prior to obtaining a Development Permit for Operational Works. This amount will be
subject to variations in the Consumer Price Index, All Groups Brisbane from June 2005 until
the date of payment.
Undergrounding Power
52. The power supply both external and internal shall be underground. This work shall be at no
cost to Council.
Stormwater Drainage
53. All stormwater drainage from the site shall be collected on site and discharged generally in
accordance with Plan - Drainage Design 0379 SK 05B dated October 2004 prepared by Greg
Gibbs Architects, so there is no net increase in stormwater runoff from the site up to a Q100
event. Plans of the drainage design shall be prepared by a Registered Professional Civil
Engineer and submitted to Council prior to obtaining a Development Permit for Operational
Works.
54. Roof runoff from any new dwelling unit or apartment shall be directed to a rainwater storage
system or tank (minimum storage 1400 litres per dwelling unit (villa) and 1000 litres per
service or non-serviced apartment) that is plumbed to service the toilets in the new dwelling
and landscaping areas. The design of the rainwater storage system shall be to the
satisfaction of the Manager Plumbing Services.
55. Overflows from rainwater tanks may be discharged into the gravel drains proposed.
56. An approved maintenance plan for the treatment system shall be incorporated in the
Management Scheme for the development and a copy of this shall be provided for Council’s
records prior to commencement of the approved Use.
57. All site stormwater drainage shall be by means of a gravity system.
Sewer and Water
58. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
59. All internal water and sewerage reticulation to be designed and constructed in accordance
with Noosa Shire Council Engineering Design Guidelines (PSP6).
60. A concept plan detailing proposed internal water and sewer reticulation network is to be
submitted for approval prior to preparation of Operational Works Drawings.
61. An application for Operational Works, Water Supply and Sewerage detailing proposed
internal water supply and sewerage reticulation works is to be lodged with Council in respect
of the proposed development.
62. After completion of internal water and sewerage reticulation, all works shall be considered
as “private sewers and water mains” and responsibility for operation and maintenance shall
be the property owners.
63. The water connection to the water reticulation system shall extend to the property boundary
and be metered.
Page 8 of 17
Document Set ID: 23615315
Version: 3, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132004 5744 13 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.