Skip to the record
Accept no substitutions.

Council archive · source document

15104 - SBSMP - Rev 0 · MCU13/0215

Attached to the e-mail OPW16/0097 - Operational Works Application.

Attached to the e-mail Operational Works Application – OPW16/0253.

of 70

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                     15104 - SBSMP/0
                                                                                                Page 13




Figure 5.3 shows the XP-RAFTS model used to represent the post development mitigated site
scenario for the proposed development. Node “Post-D Mit” represents the area of the proposed
development (all roof and surface areas) discharging to the detention tank, “Post-D Unm”
represents the area of the proposed development not discharging to the detention tank and
“LPD” represents the legal point of discharge. Mitigation has been implemented in the form of
a detention tank at the node labelled “Tank” in the XP-RAFTS model.




                       Figure 5.3 - XP-RAFTS Post Development Mitigated Model

As the roofwater/internal drainage network has been designed to convey stormwater up to the
Q20 storm event, a bypass link has been included in the XP-RAFTS model to divert all flows
exceeding the roofwater drainage capacity to the legal point of discharge as this runoff cannot
be captured and detained in the detention tank. The bypass link diverts discharge greater than
the post development Q20 peak flow rate of 0.088m3/s from node “Post-D” to node “LPD”. The
bypass link is labelled “Diver1” in the XP-RAFTS model.

Table 5.8 summarises the input parameters used in the model for the post developed mitigated
site scenario. No source node parameters were used for the “Tank” node and the “LPD” node.

           Table 5.8 – XP-RAFTS Source Node Parameters – Post Development Mitigated
                                                       Post Development Mitigated
                                            Post-D Mit                           Post-D Unm
         Parameter
                               Sub Catchment 1 Sub Catchment 2 Sub Catchment 1 Sub Catchment 2
                                  (Pervious)        (Impervious)        (Pervious)        (Impervious)
     Initial Loss (mm)                 0                   0                 0                N/A
 Continuous Loss (mm/hr)              2.5                  0                2.5               N/A
   Catchment Area (ha)              0.028               0.096             0.023               N/A
  Impervious Percentage               0%                 100%               0%                N/A
       Vectored Slope                 5%                  5%               15%                N/A
        Manning's "n"                0.03               0.015              0.03               N/A
      IFD Coefficients          Sunshine Beach     Sunshine Beach    Sunshine Beach           N/A
    Storage Coefficient              N/A                 N/A               N/A                N/A




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.