5.3.4 On-Site Detention
In order for the post development stormwater discharge conditions to match pre development
conditions for all storm events, it is proposed to provide a total of 22.59m3 of stormwater
storage via a semi-submerge 23,000L (or 23m3) pre-cast concrete detention tank from All Cast
Pre Cast. This detention tank system will over mitigate captured post development flows from
the development to ensure the combined post development discharge from the site does not
exceed pre development flows. It is proposed to locate the detention tank at the southern
corner of the site under the raised deck area. The proposed detention tank will have the
following features:

       Tank external diameter = 3.48m;
       Tank internal diameter = 3.37m
       Tank Overall height = 2.8m;
       Tank internal height = 2.6m;
       Tank capacity = 23.19m3
       A 140mm diameter orifice place over a 150mm diameter outlet pipe located at the base
        of the tank in order to discharge minor flow (at pre development flow rates) to a
        surcharge pits before discharging to the legal point of discharge (LPD);
       A 225mm diameter high flow pipe located 2.3m above the base of the tank in order to
        discharge overflow (at pre development flow rates) to the proposed swale drain before
        discharging to the LPD.

Refer to Appendix G for the typical pre-cast tank details from All Cast Pre-Cast and Appendix
H for the detailed civil engineering plans.

5.3.5 Detention Basin Analysis
Table 5.9 provides a summary of the detention tank results in the XP-RAFTS model for the post
development mitigated site scenario. The results show detention outflow (Tank Outflow), the
storage depth within the tank (Tank Stage) and detention volume reached (Tank Storage) to
ensure that pre development flow conditions are achieved for all storms.

Refer to Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and
major storm detention tank model results summarised in Table 5.9.




Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.