5.3.4 On-Site Detention
In order for the post development stormwater discharge conditions to match pre development
conditions for all storm events, it is proposed to provide a total of 22.59m3 of stormwater
storage via a semi-submerge 23,000L (or 23m3) pre-cast concrete detention tank from All Cast
Pre Cast. This detention tank system will over mitigate captured post development flows from
the development to ensure the combined post development discharge from the site does not
exceed pre development flows. It is proposed to locate the detention tank at the southern
corner of the site under the raised deck area. The proposed detention tank will have the
following features:
Tank external diameter = 3.48m;
Tank internal diameter = 3.37m
Tank Overall height = 2.8m;
Tank internal height = 2.6m;
Tank capacity = 23.19m3
A 140mm diameter orifice place over a 150mm diameter outlet pipe located at the base
of the tank in order to discharge minor flow (at pre development flow rates) to a
surcharge pits before discharging to the legal point of discharge (LPD);
A 225mm diameter high flow pipe located 2.3m above the base of the tank in order to
discharge overflow (at pre development flow rates) to the proposed swale drain before
discharging to the LPD.
Refer to Appendix G for the typical pre-cast tank details from All Cast Pre-Cast and Appendix
H for the detailed civil engineering plans.
5.3.5 Detention Basin Analysis
Table 5.9 provides a summary of the detention tank results in the XP-RAFTS model for the post
development mitigated site scenario. The results show detention outflow (Tank Outflow), the
storage depth within the tank (Tank Stage) and detention volume reached (Tank Storage) to
ensure that pre development flow conditions are achieved for all storms.
Refer to Appendix I and Appendix J for the XP-RAFTS post development mitigated minor and
major storm detention tank model results summarised in Table 5.9.
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.