Council archive · source document
Netanya Refurb_GIA Issue Set_210407 · 51901.3614.02
Attached to the e-mail Generally in Accordance - Landscaping & Colour Palette - 51901.3614.02, 51901.3786.03, 51992.479.02, 51994.1249.02, 51994.1048.02 & MCU13/0081.02.
Very large file (20.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
A B
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F
G GIA Issue MS 07.04.21
C
C
Remove existing FC cladding to Balcony,
Replace existing screen with new 16 x 40 mm Party Wall between Building A & Building B.
New DP within cavity to
powdercoated aluminium RHS batten screen, Check integrity of existing wall. Make good
discharge into unused
fully welded to intemediate 40 x 40 RHS all surfaces prior to select proprietary-type
planter.
powdercoated aluminium frames waterproof applied non-combustible render
BUILDING A BUILDING B
& membrane paint system.
New DP within cavity to New 'PosiGlaze' balustrade system.
discharge into unused End Base channel 75 mm off side N-DP to be cored into
N-DP to discharge New 'PosiGlaze' balustrade system. New DP's to Building B
planter walls with stainless steel toprail masonry balustrade, to
on to balcony End Base channel 75 mm off side to run within wall cavity to
exit wall at low level to
walls with stainless steel toprail connect to existing DP's
connect to existing DP
OC OVF OC OC OVF OC OC OVF OC
BAL-B3 BAL-B3 BAL-B3 AL Louvre BAL-B3 BAL-B3 BAL-B3 BAL-B4 BAL-B4 BAL-B4 AL Louvre BAL-B4 BAL-B4 BAL-B4
N-DP to GD N-RWO GD GD N-RWO GD GD N-RWO GD
connect with U405 balcony U406 balcony U407 balcony U408 balcony U409 balcony U410 balcony U411 balcony GD U412 balcony GD U413 balcony GD U414 balconyGD U415 balcony GD U416 balcony GD Select powdercoated
exist. DP in (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) alum. 'Heka' sun
fall
cavity wall TL-07 hood over windows
TL-07 TL-07 EX-DP TL-07 TL-07 TL-07 TL-07 TL-07 TL-07 EX-DP TL-07
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
fall
EX-DP TL-07 to unit below
N-DP N-DP N-DP N-DP N-DP N-DP N-DP N-DP N-DP TL-07 EX-DP
EX-DP offsets in- EX-DP EX-DP EX-DP EX-DP offsets in-
wall N-DP N-DP N-DP N-DP N-DP wall N-DP
EX-DP
EX-DP in wall
U405 U406 U407 U408 U409 U410 U411 U412 U413 U414 U415 U416
New DP's to run within New DP's to run within Existing Units
wall cavity to connect to wall cavity to connect to (no works) Select powdercoated
existing DP's.. existing DP's.. alum. 'Heka' sun hood
surround to window
BAL-B2
U404 terrace
(new tiled finish)
fall TL-07 Powdercoated
N-RWO aluminium folded flashing
to top of duct to match
GD adjacent new roofing
EX-DP in wall
BAL-B2
N-
RWO
U403 balcony
(new tiled finish)
TL-07
U405 Walkway
D
fall
fall (new tiled finish)
F. H. R.
TL-07 Void
SETOUT POINT
1
Void Void
L-0
1
L-0
BA
GD
EX-COL EX-COL
BA
EX-DP EX-COL BAL-02 BAL-02
EX-DP N-DP N-DP
BAL-01
BAL-01
Refuse
BAL-01
BAL-01
BAL-02
EX-DP BAL-01 BAL-01 Suite 2,
BAL-B2
EX-DP in wall Existing TL-07 TL-07
Existing falls Cnr Gard
Lift Core 01 TL-07
Walkway to be maintained
BAL-02 (new tiled finish) BAL-02 Alexand
U402 balcony EX-DP PO Box
BAL-02
(new tiled finish) N-COL EX- EX-COL N-DP
FHR
BAL-ST1
KEX
U403
BAL-ST1
TL-07 DP P 07 54
Existing
BAL-ST1
fall
(new tiled finish)
BAL-ST1
Lift Core 02 admin@
Walkway
N-RWO
Existing Units EX-COL
Select weatherboard N-COL
GD (no works)
D cladding to subframe Fire Stair 01 Fire Stair 02
fixed to existing Extension Extension SUNCOAST RESORT BUSINESS CENTRE
BAL-B2
blockwork wall
EX-DP in wall SUITE 2 CNR GARDAK ST & SURF RD
N-
N-DP N-DP ALEXANDRA HEADLAND Qld 4572
RWO
U401 balcony PO BOX 6232 MAROOCHYDORE BC Qld 4558
(new tiled finish) PH : 07 5443 5028 FAX:07 5479 2380
TL-07 Select powdercoated
fall New powdercoated ABN 23 123 917 724
U402 New slab-fixed frameless
New powdercoated
aluminium screen fixed
aluminium 'Heka' sun
aluminium screen fixed EMAIL: [email protected]
TL-07 fall hood box surround to
GD glass balustrade with to stair / slab edge to stair / slab edge
window opening
powdercoated aluminium
uprights project
PROPOSED ALTERATIONS &
BAL-02
ADDITIONS TO EXISTING
RESORT BUILDING
EX-DP
for
EX-DP
NETANYA RESORT
U401 Existing Feature powdercoated
at
Fire Stair 03 aluminium placards fixed
to existing blockwork wall 75 HASTINGS STREET
EX-DP
in wall NOOSA HEADS
drawing
N-DP
NEW WORKS - THIRD FLOOR
Select powdercoated New 100 x 25 powdercoated
alum. 'Heka' sun hood aluminium screen fixed to wall /
surround to window slab edge
AS SHOWN
date 7/04/2021 drawn JP scale @A1
drawing no. 19021 SD20.03 revision G
B
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
LEVEL 3 Scale 1:100
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
Scale 1:100 0 5 10 20 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
About this file
- File size
- 20.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.