Council archive · source document
Netanya Refurb_GIA Issue Set_210407 · 51901.3614.02
Attached to the e-mail Generally in Accordance - Landscaping & Colour Palette - 51901.3614.02, 51901.3786.03, 51992.479.02, 51994.1249.02, 51994.1048.02 & MCU13/0081.02.
Very large file (20.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
C MCU DA Issue MS 06.03.20
A B
D Client Revisions MS 14.04.20
E MCU DA MS 05.08.20
Information Response
F
G GIA Issue MS 07.04.21
C
C
12610
New DP to run within
14035
wall cavity to connect to
existing DP's
Aluminium Archclad Cliptray 48 mm aluminium
New raised tiled surface on
'VersiPave®' pedestals or other
BUILDING A New 200 x 50 powdercoated
aluminium awning portal frame,
columns and beams to future detail,
with select powdercoated 'timber-look'
standing seam roofing, with concealed fixing clip
(CBR), fixed to 'Multiboard eXbound 15 mm', over
non-combustible vapour permeable sarking. Roof
structure as per structural engineer's details.
New 200 x 50 powdercoated
aluminium awning frame with 25 x 50
powdercoated 'timber-look'
BUILDING B
aluminium battens under and select
proprietary type adjustable New DP to run within aluminium battens over. Max. height of Installed in accordance with manufacturer's
16mm glass roof sheeting over
paver supports. FFL of Building wall cavity to connect to 2.5 m AFFL; max. covered area = 9m2 specifications and details at equal centres over
A to match FFL of Building B existing DP's existing mass roof structure.
New DP to runrun within
within New DP within cavity to New DP within cavity to
N-DP to discharge wall cavity to connect to discharge into unused discharge into unused New DP within cavity to New DP's to Building B
on to balcony existing DP's
DP's.. planter planter discharge into unused to run within wall cavity to
planter connect to existing DP's
N-DP to be cored into
G masonry balustrade, to
exit wall at low level to
connect to existing DP.
N-DP to
Fall
Fall
5°
5°
Fall
5°
connect with New fascia gutter
exist. DP in FL FL FL FL FL FL FL FL to end section
cavity wall FL FL FL FL FL FL
CBR CBR CBR
CBR CBR
Fall
Fall
Fall
S.S vent pipe BAL-R5 BAL-R5
cover fixed N-RWO N-RWO N-RWO BAL-R2 N-RWO
BAL-R2 BAL-R2 BAL-R2 BAL-R2 BAL-R2 N-RWO BAL-R2 N-RWO BAL-R2 N-RWO BAL-R2 N-RWO BAL-R2 N-RWO BAL-R2 N-RWO BAL-R2
to hob under
S.S.VP
3
U405 Terrace U406 Terrace U407 Terrace U408 Terrace U409 Terrace U410 Terrace
L-R
'VersiPave®', CFV
Refer to detail U411 Terrace U412 Terrace U413 Terrace U414 Terrace U415 Terrace U416 Terrace
BA
shown OC
OC MV
dashed MV MV MV MV FFL13.840 MV
BAL-R3
OC
(new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish) G OC
Continuous FFL13.840 TL-08
hob under OC
SK
-R4
pergola posts
BAL
F1
BA
shown (new tiled finish) -P HWS MV MV
L-
L
PF
dashed F1 BA N-RWO N-RWO
1
-P VP (new tiled finish) VP (new tiled finish) VP VP (new tiled finish) SK
BAL-R4
L (new tiled finish) (new tiled finish) VP
BA HWS
TL-08 TL-08 TL-08 TL-08 TL-08 TL-08 TL-08 TL-08 TL-08
St
G
SK
SK
SK
SK
SK
HWS TL-08
G TL-08 G
air
SK
DG
New New concrete New concrete New concrete SK SK
PO
FFL13.840 SK
Spa hob under hob under hob under S New concrete S New concrete
EX-COL
HW
HW
HW
HW hob under HW
St
TL-09 S S hob under
S
S
S
S
air
Linen HW HW Existing hob under
HW
R4
Chute VP
St
L-
St
St
St
VP to remain. Confirm
HW
VP VP
air
BA
air
air
air
Vent TL-09 TL-09 TL-09 TL-09
ir
1
Br lass
S
level on site
Sta
PF
s
ick
L-
HWS TL-09 TL-09
G
BA
FFL13.840
BA
VP Gate Gate Gate Gate Gate
L-
PF
5
TL-09 TL-09 TL-09 N-DP Gate
N-RWO MV TL-09 TL-09
FHR
Approximate Gate Gate Gate Gate N-DP Walkway FFL13.840 N-DP
location and BAL-R1 BAL-R1 BAL-R1 EX-COL
BAL-R4
RHS
surround of skylight TL-09 RHS RHS
Gate
Glass
HW
to bedroom under
Fascia gutter
FL Bricks FL
S
N-DP N-COL
TL-08 D
BAL-R1
FFL13.840 Approximate location of existing
SK
New concrete Walkway TL-08 SETOUT POINT joint line in slabs between N-RWO Void New Roof Void Void
SK N-DP
(connect to
2°
BAL-R1
BAL-R1
N-RWO
New Roof
hob under Building A and Building B
BAL-R1
BAL-R1
EX-DP below) TL-08 TL-08 with spitter
FHR
Fascia gutter Fascia gutter FL
er
VP CBR
2°
utt
N-RWO HWS BAL-R1 BAL-R1 TL-08 Suite 2,
BAL-R1
OC
ag
in CPB N-RWO FFL13.840
FFL13.840 FFL13.840 FL CBR
Existing
sci
Cnr Gard
New Roof
New Roof
OC New raised tiled surface CBR
MV FL CBR
Fa
Gate Lift Core 01 on 'VersiPave®' pedestals FL FL FL
2°
2°
New concrete TL-08 New powdercoated aluminium Alexand
BAL-R4
hob under or other proprietary type
gate and side screen to FL
adjustable paver supports. BAL-R1 FL BAL-R1 PO Box
U403 Terrace recessed roof terrace entry N-COL N-COL Fascia gutter
BAL-R1
FFL of Building A to match
BAL-ST1
KEX
BAL-ST1
(new tiled finish) FFL of Building B
Lift 02 P 07 54
BAL-ST1
BAL-ST1
TL-09
200 x 50 powdercoated Extension admin@
aluminium portal frame, N-COL
FL N-COL
columns and beams to shower Select weatherboard Fire Stair 01 Select powdercoated Select powdercoated
D VP cladding to subframe
New powdercoated
alum. 'Heka' sun
Fire Stair 02 alum. 'Heka' See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
About this file
- File size
- 20.9 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.