response to information request Plover St
7. Provide amended plans detailing (location, depth, pipe size, etc.) the
existing sewer line in relation to the proposed works.
8. Provide Unity Water’s approval for the proposed works adjacent and/or
over the existing sewer line.
The sewer is located in the front of the site and the development does not propose any
construction within 1.5m of the existing infrastructure.
9. Provide amended plans detailing (location, depth, pipe size, etc.) the
existing stormwater line in relation to the proposed works.
10. Provide amended plans showing the creation of an easement over this
asset in accordance with Noosa Council’s Planning Scheme.
Please find attached advice from TODs consulting engineers in regard to the redundant
stormwater infrastructure on the site. The engineers recommend the old pipes to be
removed as part of the construction works.
11. Provide details, prepared by a RPEQ (Registered Professional Engineer of
Queensland), of the proposed earthworks, including, but not limited to:
extents; volumes; existing and finished levels; cross-sections; batters
and/or retaining structures; stabilisation methods proposed, etc.
12. Provide additional detail on the proposed retaining walls. The detail must
be prepared by a RPEQ and include but not be limited to:
12.1. The type of wall construction (material, foundations etc.);
12.2. Section plans indicating the location of the walls and foundations in
relation to the property boundary, the building pad, finished floor
levels, proposed deck, driveway, etc.;
12.3. The structures required to collect and convey existing overland
flows that are impacted on by the construction of the walls;
12.4. Any fencing to be installed on top of or beside the walls;
Page 4 of 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.