Herbicide monitoring in stormwater entering and leaving the construction site should be
performed when applications are known to occur, rather than routinely. Some
herbicides have a short residence time, so arrangements may need to be made with the
laboratory for rapid courier service and turnaround time. The monitoring schedule is
listed in Table 11-3
11.2 Water Quality Monitoring During Routine Operation of the Essence of Peregian
Sampling should be performed at sites 1 to 9. The temporal sampling frequency is
recommended at monthly intervals for the first 12 months, with quarterly sampling
thereafter (Table 11-3). This temporal frequency is intended to show the proportional
improvement from the existing water quality condition in response to improved
stormwater management associated with the new development. Seasonal variations
can be identified from the quarterly samples. Herbicide monitoring is as described for
the construction phase.
Table 11-3: Monitorina Schedule for the Construction and Operational Develooment
Site Site Site Site Site Site Site Site Site Site Site Site Site Site
Parameter
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Rainfall S
pH M M M M M M M M M
Dissolved M M M* M M M M M M
oxygen
BOD, M, M* M* M, M M* M* M M
Suspended M M M M M M M M M* S S S S
Solids
Total M M M' M M M M* M M
Nitrogen
Total M M M M M M M M M
Phosphorus
Herbicides M M M M M M M M M S S S S
Faecal M M M M M' M M M M
coliforms
Enterococci M M M M M M M M M
Turbidity M M M M M M M , I M* I M,
M = monthly monitoring during construction and during the first two years of operation; quarterly monitoring during
the second year and thereafter.
S = Monitoring during stormwater flow events
02012 Simmonds & Bristow Pty Ltd Contrast Constructions J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3.0 ta_120113 doc Page 20 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.