(CiPy future-plus
ENVIRONMENTAL
4377-131119-1.0
acy} tLe) Recommended Separation Distance
stormwater drainage channel or drain
Bore or a dam used or likely to be used for 30m for secondary, 10m for advanced secondary
human and or domestic consumption
Unsaturated soil depth to a permanent water 0.6m (vertical) for secondary, 0.3m (vertical) for advanced secondary
table
Note: Surface spray irrigation system must be located at least 10m from any habitable area
4.4 STORMWATER DRAINAGE
Issues relating to surface flows may become prevalent within the disposal areas during
extended periods of rainfall. Accordingly, it is recommended that a cut-off drain or diversion
drain/mound is constructed upslope of the disposal areas to collect and divert any
surface/subsurface waters away from the disposal area. A retention mound is to be
constructed downslope of the land application area to prevent any surface water from exiting
the designated disposal area.
All stormwater runoff from the roof of buildings and pavement areas associated with the
development on the site should not be discharged in a concentrated form onto the effluent
disposal areas.
February 2014 Site & Soil Evaluation Report 12
Wastewater Treatment and Effluent Disposal
314 Cooroy Mountain Road, Cooroy MountainSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.